6.5.9 Replacing a Component Inside the Electric Control Box
Prerequisites
Tool: a Phillips screwdriver.
A component inside the electric control box, such as the main control board, circuit
breaker, AC contactor, fuse, or fuse base, needs to be replaced.
Spare components of the same model are available and functional.
Procedure
Step 1
Tap
Shutdown
on the LCD home screen. Switch off the circuit breaker of the smart cooling
product in the PDC, and check whether the ports are electrified (Use a multimeter to check
that the AC voltage of the port is 0 V.).
Exercise caution because the NetCol5000-A is still energized when it is being shut down on
the LCD.
Step 2
Open the rear door and remove the air filter.
Step 3
Remove all cables and terminals connected to the electric control box.
Step 4
Use a Phillips screwdriver to remove the five screws in the front of the electric control box, as
shown by (1) in
, pull the electric control box along the guide rail by the handle, as
shown by (2) in
, and take out the electric control box.
Figure 6-18
Removing the electric control box
Step 5
Replacing the electric control box.