FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
4 Installing Pre-fab. Modules
Issue 02 (2020-01-15)
Copyright © Huawei Technologies Co., Ltd.
26
It is recommended that you tighten the base twistlocks after pre-fab. modules are hoisted in place.
----End
4.2.2 Removing the Pre-fab. Module Protective Cover
Prerequisites
The weather condition is good without rain or snow.
Context
A protective cover is installed to protect the pre-fab. module during transportation.
Preparations
Tools: safety helmet, safety belt, step ladder, protective gloves, utility knife
Materials: none
Skill requirement: common technician
Procedure
Step 1
Cut open the protective cover using a utility knife and remove the protective cover.
When removing the protective cover, take protective measures for working at heights.
----End
4.2.3 Hoisting and Securing Pre-fab. Modules
Prerequisites
To facilitate subsequent installation, ensure that pre-fab. modules are level after hoisting.
Select an appropriate crane based on standards of the crane company, and ask a
professional to assess the crane onsite.
Twistlocks in pre-fab. module bases are in correct positions.
The hoisting ropes are available.
The doors of pre-fab. modules to be hoisted are closed.
Ensure that the weather condition is good without wind when pre-fab. modules need to
be hoisted outdoors.