
Installation
Sequence
Subcategor
y
Item
Tools
Materials
Installation Method
(Corresponding Chapter
in Installation Guide)
Diagram
ID
Installation
Drawing
Installing
expansion bolts
Vacuum cleaner, hammer drill,
adjustable wrench, and claw hammer
Expansion bolt (M16x150)
Installing bases
Torque wrench, height gauge, level,
straight steel ruler, right angle,
marker, ink fountain, long steel
measuring tape, rubber mallet
Single-capacity base
Hoisting and
securing
containers
Crane, adjustable wrench, torque
wrench, jack, steel hoisting rope,
measure tape, leveling pipe, level,
and straight steel ruler
Containers to be hoisted, 3 mm
thick spacers made of passivated
304 stainless steel or hot-dip Q235
zinc (to be purchased onsite)
Installing twistlocks
Adjustable wrench
Twistlocks
Grounding
Containers
Grounding
containers
Torque wrench
Ground lug
Grounding Containers
Installing
external
accessories
Replacing
Door Handles
Replacing door
handles
Hex key
Stainless steel door handles
Replacing Door Handles
NO.S002
Door Handle Layout
Diagram
Checklist of Devices Installed Onsite for AIO 40 ft
Installing
containers
Installing Container Bases
Hoisting and Securing
Containers
Container Layout
Diagram
Installing
containers on
bases
NO.S001