NO TE
During movement, do not tilt it for 90
o
.
Procedure
Step 1 Check that the external package of the unit is intact. If any damage is found,
notify the carrier immediately.
Step 2 Remove the packing materials. Check whether the exterior of the unit is in good
condition and free of collision marks or scratches. If any damage is found, notify
the carrier immediately.
NO TE
● Do not remove the plastic package to prevent dust and other sundries from entering the
unit. Remove the plastic packing materials before connecting pipes and cables.
● After pipes and cables are connected, take dustproof measures in a timely manner
based on site requirements.
Step 3 Check the type and quantity of fittings against the packing list. If some fittings are
missing or do not comply with the models in the packing list, record the
information and contact the supplier immediately.
----End
5.4.2 Securing a Unit
Context
Figure 5-3 Port reserved for combining smart cooling products
(1) Reserved port for combining units on the
end
(2) Reserved port for combining units on the
side
FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
5 System Installation (FDC Scenario)
Issue 03 (2021-04-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
74