Procedure
1. Install two PSUs on the server, and connect cables to the PSUs.
2. Power on the server, and start the server OS.
3. Remove the power cable from one of the PSUs.
Expected Results
After the power cable is removed, the server is still operating
properly.
Test Result
Remarks
4.3.2 Testing Fan Module Redundancy
Case No.
4.3.2
Test Objective
To verify that fan modules on the server work in redundancy
mode.
Test Networking
Diagram
See section
.
Prerequisites
l
The server is powered on.
l
A Linux OS has been installed on the server.
Procedure
1. Power on the server, and start the server OS.
2. Log in to the iBMC WebUI, and query the current fan speed.
3. Remove one of the fan modules, and check whether the OS is
still running properly.
4. Log in to the iBMC WebUI, and query the current fan speed.
Expected Results
After the fan module is removed, the server OS is still running
properly and the speed of the other fan modules increases for
better cooling.
Test Result
Remarks
4.3.3 Testing Hard Disk Redundancy
Case No.
4.3.3
Test Objective
To verify that hard disks on the server work in redundancy mode.
Test Networking
Diagram
See section
.
Prerequisites
The server is powered on.
5288 V5 Server
Acceptance Guide
4 Test Cases and Records
Issue 03 (2019-03-25)
Copyright © Huawei Technologies Co., Ltd.
19