3.6.3 Removing the Server and Holding Rails
Step 1
Wear an ESD wrist strap or ESD gloves. For details, see
Step 2
Power off the server. For details, see
4 Powering On and Off the Server
.
Step 3
Disconnect all power cables and signal cables from the server.
Step 4
Remove the server.
1.
Loosen the captive screws on the server panel using a screwdriver. See (1) in
.
Figure 3-35
Removing the server from the holding rails
2.
Pull out the server along the guide rails away from the cabinet as far as the server will
go. See (2) in
.
3.
Pull the release button upwards, and pull the server out. See (1) and (2) in
.
5288 V3 Server
User Guide
3 Installing and Removing the 5288 V3
Issue 26 (2018-11-19)
Copyright © Huawei Technologies Co., Ltd.
84