![Huawei 5288 V3 V100R003 User Manual Download Page 76](http://html.mh-extra.com/html/huawei/5288-v3-v100r003/5288-v3-v100r003_user-manual_169672076.webp)
Figure 3-15
Installing a server on holding rails
NOTE
– Ensure that the inner rail is clipped into the middle rail, and then slowly push the chassis inside
until you hear a click, as shown in (1) in
– If the inner rail is not clipped into the middle rail, the rolling balls and the holding rail may be
damaged as shown in (2) and (3) in
.
Figure 3-16
Clipping the inner rail into the middle rail
5.
Press the release buttons on both sides, and push the server into the cabinet until the
server cannot move forward. See
.
5288 V3 Server
User Guide
3 Installing and Removing the 5288 V3
Issue 26 (2018-11-19)
Copyright © Huawei Technologies Co., Ltd.
66