Ensure that the shielded layer is intact when stripping outer jackets off the network cable.
Keep the cable insulation intact when stripping the shielded layer.
Figure 6-50
Stripping the cable
Step 2
Arrange core wires in the order of colors shown in
and fix the cable support rack
to the bottom of the core wires.
Figure 6-51
Core wire order
Step 3
Hold the arranged core wires and route them through the load bar, as shown in
shows the mapping between the core wires and pins of the connector.
AP8082DN and AP8182DN
Hardware Installation and Maintenance Guide