No.
Check Item
7
The power cables and ground cables are separated from other cables and
bundled separately.
8
The working ground, protection ground, and surge protection ground
share the same group of ground bars.
9
Connectors of signal cables are complete, intact, and tightly connected.
The signal cables are not damaged or broken.
10
PG connectors of network cables and optical fibers are secured fastened
as required.
11
Labels on cables, feeders, or jumpers are clear and correct.
2.9 Powering on the AP
After the AP is powered on, observe indicators on the AP to determine the system running
status. For details, see
NOTE
Do not frequently power on and off the device.
AP8082DN and AP8182DN
Hardware Installation and Maintenance Guide
2 AP Installation
Issue 03 (2019-04-01)
Copyright © Huawei Technologies Co., Ltd.
42