background image

6

Store Allen Keys into the Cable Clip

Step 9

Fix Tilt Angle of the Monitors

Step 7

Manage Cables

Step 8

E 15/64 in.(6mm)

D 1/8 in.(3mm)

E

15/64 in.(6mm)

Summary of Contents for HNHM5

Page 1: ...est quality products and services in the industry Please share your experience of our product with others at www huanuoav com reviews if you are satis ed Should you have any issues please don t hesita...

Page 2: ...o not understand the instructions or have any concerns or questions please contact customer service at support huanuoav com This product may contain moving parts Use with caution Do not use this produ...

Page 3: ...STEP 1 3 Install part 03 to pole 02 STEP 2A 1 2 Step 2A 01 02 B D D 3mm 03 For C Clamp Mounting 01 Step 1 Connect Upper Pole to Lower Pole S S Loosen the screw S on pole 02 using Allen key E Connect...

Page 4: ...o the thickness of desktop STEP 2A 2 Install part 04 to part 03 STEP 2A 3 Secure the mount to the desktop STEP 2A 4 Install part 08 to pole 02 STEP 2B 1 Step 2B 3 A B D E 04 02 04 03 08 For Grommet Mo...

Page 5: ...m Only one bolt size ts your monitor 100 mm 7 7 8 in 75 mm 4 in 05 07 E Install Cable Clip Monitor Connector to the Pole Assembly Slide the cable clip 07 and monitor connector 05 in sequence to the po...

Page 6: ...t length Verify adequate thread engagement with bolts or bolts spacers combination We recommend thread engagement by at least 5 turns Too short will not hold the monitor Too long will damage the monit...

Page 7: ...6 Store Allen Keys into the Cable Clip Step 9 Fix Tilt Angle of the Monitors Step 7 Manage Cables Step 8 E 15 64 in 6mm D 1 8 in 3mm E15 64 in 6mm...

Page 8: ...lt Warning To avoid tipping please be careful not to extend the monitor too far back ward When you adjust the angle of the monitor please make sure the monitor is balanced to avoid instability of the...

Reviews: