![HTS HRP 30 C 2 Installation And Maintenance Manual Download Page 11](http://html1.mh-extra.com/html/hts/hrp-30-c-2/hrp-30-c-2_installation-and-maintenance-manual_2179532011.webp)
ACOUSTIC RETURN AIR PANEL : FURING DETAILS
Unit Size Width
Depth
Return Air
Opening
Min Stud To Stud
Distance A
"B" with Side
Risers
"B" With
Back
Risers
HRP 30
16
18.5
14
18 1/4 Min
18
23
HRP 40
16
18.5
14
18 1/4 Min
18
23
HRP 60
18
21.5
16
20 1/4 Min
21.5
26.5
HRP 80
18
21.5
16
22 1/4 Min
21.5
26.5
oNotes:
- Return air Panel is field painted by others
- Drywall frame is to be mounted such that there is 1/2" maximum
clearance between heat pump return air flange and return air panel
- Mount Return Air Panel centered in front of Return Air opening
- For REAR risers allow an additional 5" clearance at back of units
- Installing contractor to insulate drywall enclosure with acoustical
thermal batt insulation.
Return Air Flange
1/2" Clearance Gap Required
Stud
Acoustic Return Air Panel
4 Mounting Screws Secured
into Studs
Drywall
Stud To Stud Distance "A"
Unit Width
Unit Depth
R
S
C
C
S
R
For rear risers allow 5"
clearance at back of units
B
Rear Stud
Stud
5" min
Contractor:
Date:
Engineer:
Project:
Revision:
Sept 2001
Drawing no:
108