![HTP UFT-100W Manual Download Page 25](http://html.mh-extra.com/html/htp/uft-100w/uft-100w_manual_2179416025.webp)
25
LP-542 REV. 6.2.16
2. Direct Vent, Optional Horizontal and Vertical Vent Kits
Figure 10
– Direct Vent, Vent Terminations (With Optional Kits)
All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of
¼” per foot back to the boiler to allow
drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the boiler and the
balance at 4 foot intervals on the vent pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from the
boiler.