![HTP EFT-110 Installation & Maintenance Manual Download Page 6](http://html.mh-extra.com/html/htp/eft-110/eft-110_installation-and-maintenance-manual_2179379006.webp)
6
LP-387 REV. 12.15.14
L. GLYCOL ANTIFREEZE SOLUTIONS ....................................................................................................................................... 33
M. ZONING WITH ZONE VALVES ............................................................................................................................................... 33
N. ZONING WITH CIRCULATORS ............................................................................................................................................... 33
O. MULTIPLE BOILERS ............................................................................................................................................................... 33
PART 6
– VENTING, COMBUSTION AIR, AND CONDENSATE REMOVAL ........................................................................... 34
A. GENERAL ................................................................................................................................................................................ 34
B. APPROVED MATERIALS FOR EXHAUST VENT AND INTAKE PIPE .................................................................................... 35
C. REQUIREMENTS FOR INSTALLATION IN CANADA ............................................................................................................. 35
D. EXHAUST VENT AND INTAKE PIPE LOCATION ................................................................................................................... 36
E. EXHAUST VENT AND INTAKE PIPE SIZING .......................................................................................................................... 40
F. LONGER VENT RUNS ............................................................................................................................................................. 41
G. EXHAUST VENT AND INTAKE PIPE INSTALLATION ............................................................................................................ 41
H. VENTING DRAWINGS ............................................................................................................................................................. 42
1. DIRECT VENT INSTALLATION OF EXHAUST VENT AND INTAKE PIPE ....................................................................................................... 42
2. VENTING THROUGH AN EXISTING SYSTEM ................................................................................................................................................. 46
3. INDOOR COMBUSTION AIR INSTALLATION IN CONFINED OR UNCONFINED SPACE .............................................................................. 48
PART 7
– GAS PIPING .............................................................................................................................................................. 50
A. GAS CONNECTION ................................................................................................................................................................. 50
B. GAS PIPING ............................................................................................................................................................................. 50
C. CHECK INLET GAS PRESSURE............................................................................................................................................. 51
D. BOILER GAS VALVE ............................................................................................................................................................... 52
PART 8
– FIELD WIRING .......................................................................................................................................................... 53
A. INSTALLATION MUST COMPLY WITH: .................................................................................................................................. 53
B. FIELD WIRING TERMINATIONS ............................................................................................................................................. 53
C. FIELD WIRING ......................................................................................................................................................................... 53
D. LINE VOLTAGE WIRING FOR STANDARD BOILER .............................................................................................................. 54
E. ALARM CONNECTIONS .......................................................................................................................................................... 54
F. LOW VOLTAGE CONNECTIONS FOR STANDARD BOILER ................................................................................................. 54
G. THERMOSTAT ........................................................................................................................................................................ 54
H. OUTDOOR SENSOR ............................................................................................................................................................... 55
I. INDIRECT SENSOR .................................................................................................................................................................. 55
J. OPTIONAL 0-10 VOLT BUILDING CONTROL SIGNAL ........................................................................................................... 55
K. OPTIONAL UL353 LOW WATER CUT-OFF INTERFACE KIT ................................................................................................ 56
L. WIRING OF CASCADE SYSTEM COMMUNICATION BUS .................................................................................................... 56
M. CASCADE MASTER PUMP AND SENSOR WIRING.............................................................................................................. 57
N. CASCADE FOLLOWER PUMP AND SENSOR WIRING ......................................................................................................... 57
PART 9
– START-UP PREPARATION...................................................................................................................................... 60
A. CHECK / CONTROL WATER CHEMISTRY ............................................................................................................................. 60
B. CHECK FOR GAS LEAKS ....................................................................................................................................................... 61
C. FREEZE PROTECTION (WHEN USED) .................................................................................................................................. 61
D. FILL AND TEST WATER SYSTEM .......................................................................................................................................... 61
Summary of Contents for EFT-110
Page 14: ...14 LP 387 REV 12 15 14 SPECIFICATIONS AND DIMENSIONS Figure 2 LP 387 K ...
Page 24: ...24 LP 387 REV 12 15 14 Figure 8 Piping Symbol Legend ...
Page 58: ...58 LP 387 REV 12 15 14 Figure 32 Cascade Master and Follower Wiring ...
Page 59: ...59 LP 387 REV 12 15 14 Figure 33 Internal Connection Diagram LP 293 J ...
Page 82: ...82 LP 387 REV 12 15 14 EFT 55 80 110 PARTS BREAKDOWN Figure 36 Replacement Parts LP 387 J ...
Page 88: ...88 LP 387 REV 12 15 14 ...
Page 89: ...89 LP 387 REV 12 15 14 ...