82
frame with Hexagon Flange Bolt M10×65 (8pcs), M10 nuts (8pcs),
Hexagon Flange Bolt M10×50 (4pcs)and M10locknuts(4pcs)to ensure
a torque of 40
~
45Nm.
Caution:A:These components should be greased with butter
before assembly.
B:The surface of components can not be cracked.
Check whether these components are greased with butter and then
tighten the up-and-down rocker arm assembly and L/R fore
dampers and ther components.Fix the L/R tension rods into hole by way
of the trough of open-groove nut with cotter pin(4 pcs),and make these
tension rods bisection on feet.
Summary of Contents for hs700atv
Page 1: ...1 700ATV Maintenance Manual ...
Page 5: ...5 General Information 1 Description ...
Page 85: ...85 ...
Page 100: ...100 L1 L2 30A C D I m mi n 100 0 FU E L O V E R R I D E ...