background image

 

EC DECLARATION OF CONFORMITY 

 

We  

Supplier Name:   

 

HRS Hevac Ltd

 

Address:  

 

 

10-12 Caxton Way, Watford Business Park, Watford, WD18 8JY 

 

Country:  

 

 

England

 

declare, in sole responsibility, that the following equipment 

Product:  

 

 

AquaPIV Mild Steel Buffer Vessels

 

Country of Origin:  

 

England

 

are in accordance with the requirements of the Pressure Equipment Directive 97/23/EC HRS PED Certificate  

Number:  

 

 

PED-AP-07

 

Date of Issue:    

 

11th April 2007

 

Applicable Design Standards:    

HRS Commercial Standards BS853 1996 Part 1 Grade A PD5500 Cat: 2

 

Subject products are designed, manufactured and tested according to the appropriate quality control procedures 

Date:    

 

 

01/09/14

 

On Behalf of HRS Hevac Ltd: 

Phil Turner General Manager HRS Hevac Ltd

 

 

 

 

Size (Litres) 

Fluid Group 

PED Category 

Module 

All sizes ranging from 

100 to 100,000 Litres 

 

Ch

art

 4

 

G

ro

up

 2

 

Li

qu

id

SEP 

 

 

 

Summary of Contents for AquaPIV

Page 1: ...1923 232335 Head Office mail hrs co uk www hrshevac co uk No 1 Rosemount Works Elland HX5 0EE t 01422 317070 North Factory HRS AquaPIV Operating Instruction Manual Standard Storage Capacities 300 to 30 000 litres AQUAPIVSteel Buffer Vessel ...

Page 2: ... SI 1999 2001 Cat SEP 2 PED Information The HRS Hevac standard range of buffer vessels are designed in accordance with the requirements of the Pressure Equipment Directive 97 23 EC Units classed as SEP in the PED category are not supplied with a CE mark Units in category I II are CE marked and appropriate markings and certification is supplied with each unit It is the responsibility of the user an...

Page 3: ...the Pressure Equipment Directive 97 23 EC HRS PED Certificate Number PED AP 07 Date of Issue 11th April 2007 Applicable Design Standards HRS Commercial Standards BS853 1996 Part 1 Grade A PD5500 Cat 2 Subject products are designed manufactured and tested according to the appropriate quality control procedures Date 01 09 14 On Behalf of HRS Hevac Ltd Phil Turner General Manager HRS Hevac Ltd Size L...

Page 4: ... material which may have got into the vessel Pipe work connected to the vessel must be adequately supported to prevent any loads being transmitted to the vessel Provide for thermal expansion with bends and expansion joints Fit isolation valves prior to the vessel connections to facilitate servicing NOT TO THE VENT For flanged connections tighten bolts in a diametrically opposite sequence to load t...

Page 5: ...s been first heated and maybe also from time to time Following installation and commissioning it is advisable to remove clean and reassemble any strainers All fluids must be drained when the unit is out of operation to prevent freezing or possible corrosion 5 Maintenance To drain the vessel 1 It is assumed that all isolation valves except the drain valve are open at the start 2 Switch off any system ...

Reviews: