◦ Pressing and holding the
Power On/Standby
button for more than four seconds.
◦ Selecting the Press and hold power off selection in HPE OneView.
◦ Selecting the Press and hold virtual power button selection in HPE iLO.
Application data can be lost when performing a nongraceful shutdown of applications and the OS.
Removing the compute module
Prerequisites
CAUTION:
Before removing the compute module, verify that the compute module is in standby mode by observing
that the system power LED is off or solid amber, and verify that the UID LED is off or solid blue.
Procedure
1.
Identify the proper compute module.
2. Power down the compute module
.
3. Remove the compute module from the frame
.
4.
Place the compute module on a flat, level work surface.
5.
Install the compute module end cap when the compute module is outside of the frame.
To install the component, reverse the removal procedure steps.
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
30
Removing the compute module
Summary of Contents for Synergy 480 Gen10 series
Page 23: ...Customer self repair 23 ...
Page 24: ...24 Customer self repair ...
Page 25: ...Customer self repair 25 ...
Page 26: ...26 Customer self repair ...