17. Install the server into the rack
.
18.
Connect each power cord to the server.
19.
Connect each power cord to the power source.
.
The installation is complete.
Installing a Smart Storage Battery
Prerequisites
Before installing this option, be sure that you have the following:
The components included with the hardware option kit
Procedure
1.
2.
Do one of the following:
• Disconnect each power cord from the power source.
• Disconnect each power cord from the server.
3.
Do one of the following:
•
Extend the server from the rack
•
Remove the server from the rack
.
Installing a Smart Storage Battery
159