Installation 25
Starting power to the load
Start power to the load by placing the UPS in Operate mode (on page
IMPORTANT:
AC power must be available the first time the UPS is started.
Installing the ERM in a rack
Before installing the unit, review and adhere to all warnings provided in "Precautions (on page
)."
WARNING:
A risk of personal injury or damage to the equipment exists. Uneven loading of
equipment in the rack might cause the rack to become unstable. Install the heavier
components first, and then continue to populate the rack from the bottom to the top.
1.
Install the mounting rails.
2.
Install the mounting ears on the chassis using the screws provided.
3.
With one person on each side, lift the chassis to rail level and slide the chassis on the mounting rails.
Summary of Contents for R/T3000 G2
Page 18: ...Installation 18 ...
Page 27: ...Installation 27 Attaching the ERM front bezel ...
Page 38: ...Installation 38 Installing the extension bars if included ...
Page 39: ...Installation 39 Connecting and securing the power cords ...
Page 71: ...Support and other resources 71 ...
Page 72: ...Support and other resources 72 ...
Page 79: ...Index 79 W website Hewlett Packard Enterprise 65 weight ERM 60 weight UPS 60 ...