11. Install the energy pack:
a. Install the energy pack into the holder.
b. Route the energy pack cable through the cable clip and connect to the system board.
12. Connect the storage controller backup power cable.
13. Install the system air baffle.
14. Install the PCI air baffle.
16. Do one of the following:
• Server in rack mode:
Install the server into the rack.
• Server in tower mode: Return the server to an upright position.
Hardware options installation
80