9.
.
10. Install the server into the rack
.
11.
Connect all peripheral cables to the server.
12.
Connect each power cord to the server.
13.
Connect each power cord to the power source.
The installation is complete.
Expansion board options
PCIe slot guidelines for network cards and PCIe workload accelerator
options
The following table shows the PCIe riser board slots supported with the network cards and the PCIe
workload accelerator options of the server.
Component
Slot 1
Slot 2
Slot 3
Slot 4
Slot 5
Slot 6
HPE Ethernet networking card
Yes
Yes
Yes
Yes
No
Yes
HPE Ethernet 4-port
networking card
Yes
Yes
Yes
No
No
Yes
HPE 10 Gb networking card
(Supported up to max 3 pcs)
Yes
No
No
Yes
Yes
No
Table Continued
Hardware options installation
95
Summary of Contents for ProLiant DL180
Page 30: ...24 bay SFF hot plug drive model Fan bay numbering 30 Component identification...
Page 58: ...SFF 4 Install the drive LFF SFF 58 Hardware options installation...
Page 97: ...Secondary riser cage Slot 4 Slot 5 or 6 Hardware options installation 97...
Page 128: ...Box 2 to type a controller Box 2 to type p controller 128 Cabling...
Page 129: ...Box 3 to system board Box 3 to type a controller Cabling 129...
Page 130: ...Box 3 to type p controller 8 bay SFF power cable default 130 Cabling...
Page 135: ...Mini SAS cable to SAS expander Cabling 135...
Page 137: ...M 2 SSD enablement board installed in secondary riser Cabling 137...
Page 142: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 142 Cabling...
Page 144: ...Secondary riser cage Slot 4 Slot 5 or 6 144 Cabling...