The installation is complete.
Installing the NVMe drive cage in the LFF chassis
This option only can be installed in box 1.
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• Flat-headed screwdriver
• T-10 Torx screwdriver
Procedure
1.
.
2.
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Do one of the following:
•
Extend the server from the rack
•
Remove the server from the rack
.
6.
.
7.
.
8.
Install the NVMe drive cage.
a.
Use flat-head screwdriver to pry the two box 1 fillers.
Hardware options installation
65
Summary of Contents for ProLiant DL180
Page 30: ...24 bay SFF hot plug drive model Fan bay numbering 30 Component identification...
Page 58: ...SFF 4 Install the drive LFF SFF 58 Hardware options installation...
Page 97: ...Secondary riser cage Slot 4 Slot 5 or 6 Hardware options installation 97...
Page 128: ...Box 2 to type a controller Box 2 to type p controller 128 Cabling...
Page 129: ...Box 3 to system board Box 3 to type a controller Cabling 129...
Page 130: ...Box 3 to type p controller 8 bay SFF power cable default 130 Cabling...
Page 135: ...Mini SAS cable to SAS expander Cabling 135...
Page 137: ...M 2 SSD enablement board installed in secondary riser Cabling 137...
Page 142: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 142 Cabling...
Page 144: ...Secondary riser cage Slot 4 Slot 5 or 6 144 Cabling...