13
Figure 5 Network diagram
Configuration procedure
# Configure VLANs and Dot1q termination. For the configuration procedure, see "
termination configuration example
." (Details not shown.)
# Configure the router as the PPPoE server. Configure PPPoE settings on GigabitEthernet 1/0/1.10
on the router. For more information about the PPPo E configuration, see
Layer 2—WAN
Configuration Guide
. (Details not shown.)
Unambiguous QinQ termination configuration example
Network requirements
As shown in
:
•
Layer 2 Switch C supports only single VLAN-tagged packets.
•
On Layer 2 Switch B, GigabitEthernet 1/0/2 is enabled with QinQ to adds an SVLAN tag 100 to
the packets with CVLAN ID 11.
Configure unambiguous QinQ termination so that Host A can communicate with Host B.