background image

Product code Description

Quantity

Applicable models

5185-8748

Removable cable tie

1

All power supplies

5185-8627

Console cable

1

All HPE 5920&5900 switches

5185-8722

SFP/SFP+ dust plug

Optional

• HPE 5920AF-24XG

• HPE 5920AF-24XG TAA

• HPE 5900AF-48XG-4QSFP+

• HPE 5900AF-48XG-4QSFP+ TAA

• HPE 5900CP-48XG-4QSFP+

• HPE 5900CP-48XG-4QSFP+ TAA

• HPE 5900CP-48XG-4QSFP+8Gb FC B-F

• HPE 5900AF-48G-4XG-2QSFP+

• HPE 5900AF-48G-4XG-2QSFP+ TAA

5187-9022

QSFP+ dust plug

Optional

• HPE 5900AF-48XG-4QSFP+

• HPE 5900AF-48XG-4QSFP+ TAA

• HPE 5900CP-48XG-4QSFP+

• HPE 5900CP-48XG-4QSFP+ TAA

• HPE 5900CP-48XG-4QSFP+8Gb FC B-F

• HPE 5900AF-48G-4XG-2QSFP+

• HPE 5900AF-48G-4XG-2QSFP+ TAA

• HPE 5900AF-48XGT-4QSFP+

• HPE 5900AF-48XGT-4QSFP+ TAA

Preparation for installation

11

Summary of Contents for 5900 series

Page 1: ...HPE 5920 and 5900 Switch Series Installation Guide Part Number P21287 001 Published September 2019 ...

Page 2: ...puter Software Computer Software Documentation and Technical Data for Commercial Items are licensed to the U S Government under vendor s standard commercial license Links to third party websites take you outside the Hewlett Packard Enterprise website Hewlett Packard Enterprise has no control over and is not responsible for information outside the Hewlett Packard Enterprise website Acknowledgments ...

Page 3: ...ttaching the slide rails to the rack 19 Mounting the switch in the rack 20 Grounding the switch 22 Grounding the switch with a grounding strip 22 Grounding the switch by using the AC power cord 23 Installing removing a fan tray 25 Installing a fan tray 25 Removing a fan tray 26 Installing removing a power supply 27 Installing a power supply 28 Removing a power supply 29 Connecting the power cord 3...

Page 4: ...pport 47 Accessing updates 47 Customer self repair 48 Remote support 48 Warranty information 48 Regulatory information 48 Documentation feedback 49 Chassis views and technical specifications 50 Chassis views 50 HPE 5920AF 24XG HPE 5920AF 24XG TAA 50 HPE 5900AF 48XG 4QSFP HPE 5900AF 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP HPE 5900CP 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP 8Gb FC B F 51 HPE 5900AF 48XGT 4...

Page 5: ...thernet port LEDs 69 1 10GBase T autosensing Ethernet port LEDs 69 Cooling system 70 HPE 5920 cooling system 70 HPE 5900 cooling system 71 Document conventions and icons 74 Conventions 74 Port numbering in examples 74 Command conventions 74 GUI conventions 74 Symbols 75 Network topology icons 75 5 ...

Page 6: ...QSFP JH036A HPE 5900CP 48XG 4QSFP TAA compliant Switch HPE 5900CP 48XG 4QSFP TAA JH037A HPE 5900AF 48XGT 4QSFP TAA compliant Switch HPE 5900AF 48XGT 4QSFP TAA JH038A HPE 5900AF 48G 4XG 2QSFP TAA compliant Switch HPE 5900AF 48G 4XG 2QSFP TAA Power supplies JC680A HPE 58x0AF 650W AC Power Supply 650W AC JH336A HPE FlexFabric Switch 650W 48V Hot Plug NEBS compliant DC Power Supply 650W DC Fan trays J...

Page 7: ...Product code RMN HPE description JG838A BJNGA AD0023 HPE FlexFabric 5900CP 48XG 4QSFP Switch E7W29A BJNGA AD0023 HPE StoreFabric 5900CP 48XG 4QSFP 8Gb FC B fan Trays Converged Switch For regulatory identification purposes the HPE 5900AF 48XGT 4QSFP Switch is assigned a regulatory model number RMN BJNGA AD0018 This regulatory number should not be confused with the marketing name HPE 5900AF or produ...

Page 8: ...on site and make sure ambient air flows into the switch from the cold aisle and exhausts to the hot aisle Identify the airflow designs of neighboring devices and prevent hot air flowing out of the bottom device from entering the top device The rack is sturdy enough to support the switch and its accessories The rack is reliably grounded To ensure correct operation and long service life of your swit...

Page 9: ...entration mg m3 Sulfur dioxide SO2 0 2 Hydrogen sulfide H2S 0 006 Ammonia NH3 0 05 Chlorine Cl2 0 01 EMI requirements All electromagnetic interference EMI sources from outside or inside of the switch and application system adversely affect the switch in the following ways A conduction pattern of capacitance coupling Inductance coupling Electromagnetic wave radiation Common impedance including the ...

Page 10: ... U long slide rail kit including one pair of slide rails one pair of guide rails and four M4 countersunk screws 1 kit HPE 5900AF 48G 4XG 2QSFP HPE 5900AF 48G 4XG 2QSFP TAA N A M6 screw and floating nut User supplied All HPE 5920 5900 switches 5184 6723 Grounding cable 1 All HPE 5920 5900 switches 5185 9579 Grounding screw 2 All HPE 5920 5900 switches 5185 8676 Power supply filter module 1 All HPE ...

Page 11: ... 5900AF 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP HPE 5900CP 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP 8Gb FC B F HPE 5900AF 48G 4XG 2QSFP HPE 5900AF 48G 4XG 2QSFP TAA 5187 9022 QSFP dust plug Optional HPE 5900AF 48XG 4QSFP HPE 5900AF 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP HPE 5900CP 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP 8Gb FC B F HPE 5900AF 48G 4XG 2QSFP HPE 5900AF 48G 4XG 2QSFP TAA HPE 5900AF 48XGT 4QSFP HP...

Page 12: ... Packard Enterprise shall not be liable for any consequence caused thereby Figure 1 Hardware installation flow Procedure 1 Installing the switch in a 19 inch rack 2 Grounding the switch 3 Installing removing a fan tray 4 Installing removing a power supply 5 Connecting the power cord 6 Verifying the installation Installing the switch in a 19 inch rack Procedure 1 Review the following 12 Installing ...

Page 13: ...ween the front and rear rack posts 401 mm 15 79 in to 895 mm 35 24 in HPE 5900AF 48XG 4QSFP HPE 5900AF 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP HPE 5900CP 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP 8Gb FC B F HPE 5900AF 48XGT 4QSFP HPE 5900AF 48XGT 4QSFP TAA Using mounting brackets and short slide rails provided Depth A minimum of 1000 mm 39 37 in Distance between the front and rear rack posts 405 mm 15 94 ...

Page 14: ...nting rail kit long slide rails 1 Chassis rail 2 Long slide rail Rack mounting procedures at a glance Figure 5 Rack mounting procedure IMPORTANT To make sure that the switch is securely installed in the rack you must install both the mounting brackets and rack mounting rail kit 14 Installing the switch ...

Page 15: ...in the following table Table 4 Grounding points for the switch Switch model Grounding point Remarks HPE 5920AF 24XG HPE 5920AF 24XG TAA One primary grounding point with a grounding sign and one auxiliary grounding point N A HPE 5900AF 48XG 4QSFP HPE 5900AF 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP HPE 5900CP 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP 8Gb FC B F HPE 5900AF 48XGT 4QSFP HPE 5900AF 48XGT 4QSFP T...

Page 16: ...ng position Figure 7 Mounting and grounding positions of the HPE 5900AF 48XG 4QSFP 5900AF 48XG 4QSFP TAA 5900CP 48XG 4QSFP 5900CP 48XG 4QSFP TAA 5900CP 48XG 4QSFP 8Gb FC B F 5900AF 48XGT 4QSFP 5900AF 48XGT 4QSFP TAA switches 1 Auxiliary grounding point 2 2 Rear mounting position 3 Primary grounding point 4 Auxiliary grounding point 1 5 Front mounting position 16 Installing the switch ...

Page 17: ...ar mounting position 3 Primary grounding point 4 Auxiliary grounding point 1 5 Front mounting position Attaching the mounting brackets and chassis rails to the chassis Procedure 1 Align the mounting brackets with the screw holes in the rear mounting position or front mounting position as shown in the following figures Installing the switch 17 ...

Page 18: ...ing cable to the chassis Figure 10 Attaching the front mounting brackets chassis rails to the chassis 2 Use M4 screws provided to attach the mounting brackets to the chassis 3 Align the chassis rails with the rail mounting holes in the chassis 18 Installing the switch ...

Page 19: ...ctice connect the grounding cable to the primary grounding point or auxiliary grounding point 1 The grounding cable and grounding screw that come with the switch are suitable only for these two grounding points To use auxiliary grounding point 2 you must prepare a grounding cable yourself To connect the grounding cable Procedure 1 Choose a grounding point 2 Unpack the grounding cable and grounding...

Page 20: ...ssis 3 Verify that the slide rails have been correctly attached to the rear rack posts 4 Install cage nuts user supplied to the front rack posts and make sure that they are at the same level as the side rails 5 Supporting the bottom of the switch align the chassis rails with the slide rails on the rack posts as shown in the following figure Work with another person to slide the chassis rails along...

Page 21: ...ck 1 6 Use screws user supplied to attach the mounting brackets to the rack as shown in the following figure To secure the switch in the rack make sure the front ends of the slide rails reach out of the chassis rails Installing the switch 21 ...

Page 22: ...aximize the safety at the site and minimize EMI susceptibility of the system Procedure 1 Ground the switch by using one of the following methods Use a grounding strip at the installation site See Grounding the switch with a grounding strip on page 22 Use the AC power cord connected to the switch See Grounding the switch by using the AC power cord on page 23 NOTE The power and grounding terminals i...

Page 23: ... grounding strip 3 Attach the ring terminal at the other end of the grounding cable to a grounding post on the grounding strip and fasten the ring terminal with the removed hex nut Figure 14 Connecting the grounding cable to a grounding strip 1 Hex nut 2 Ring terminal 3 Grounding post 4 Grounding strip Grounding the switch by using the AC power cord If the installation site does not have any groun...

Page 24: ...as possible Procedure 1 Make sure that the power cord has a PE wire 2 Make sure that the ground contact in the power outlet is securely connected to the ground in the power distribution room or on the AC transformer side 3 Plug in the power cord and make sure it is securely connected to the power outlet NOTE If the ground contact in the power outlet is not connected to the ground report the proble...

Page 25: ...ng a fan tray CAUTION To prevent damage to the fan tray or the connectors on the backplane insert the fan tray gently If you encounter a hard resistance while inserting the fan tray pull out the fan tray and insert it again Select fan trays as required For the available fan trays and their specifications see Fan trays on page 58 Procedure 1 Wear an ESD wriststrap and make sure it makes good skin c...

Page 26: ...ay with a Phillips screwdriver until the fan tray is securely attached in the chassis See callout 2 in Figure 16 Installing a fan tray in the HPE 5900AF 48XG 4QSFP on page 26 or Figure 17 Installing a fan tray in the HPE 5920AF 24XG on page 26 If the captive screw cannot be tightly fastened verify the installation of the fan tray Removing a fan tray WARNING Do not take out the fan tray until the f...

Page 27: ...me switch Provide a circuit breaker for each power supply and make sure that the circuit breaker is off before installation In power redundancy mode you can replace a power supply without powering off the switch but must strictly follow the removal and installation and procedures in the following figures to avoid any bodily injury or damage to the switch Figure 18 Installation procedure Figure 19 ...

Page 28: ...ch To install a 650W AC power supply or 650W DC power supply in the switch Procedure 1 Wear an ESD wriststrap and make sure it makes good skin contact and is reliably grounded 2 Unpack the power supply and verify that the power supply model is correct 3 Correctly orient the power supply with the power supply slot as shown in Figure 20 Installing a power supply on page 28 grasp the handle of the po...

Page 29: ...s wires Procedure 1 Wear an ESD wriststrap and make sure it makes good skin contact and is reliably grounded 2 Squeeze the tabs on the power cord connector with your thumb and forefinger and pull the connector out to remove the power cord as shown in Figure 22 Removing the DC power cord on page 30 3 Hold the handle on the power supply with one hand pivot the latch on the power supply to the right ...

Page 30: ...ess the tabs on the power cord connector with your thumb and forefinger 2 Pull the power cord connector out Figure 23 Removing the power supply 1 Pivot the latch to the right with your thumb 2 Pull the power supply out 30 Installing the switch ...

Page 31: ... AC power supply Procedure 1 Insert the female connector of the AC power cord supplied with the power supply into the power receptacle on the power supply 2 Use a cable tie to secure the power cord to the handle of the power supply as shown in Figure 24 Connecting the 650W AC power supply on page 31 3 Connect the other end of the power cord to an AC power outlet Figure 24 Connecting the 650W AC po...

Page 32: ... in 2 Use a cable tie to secure the power cord to the handle of the power supply as shown in Figure 24 Connecting the 650W AC power supply on page 31 3 Connect the other ends of the wires to the DC power source wiring terminals with the negative wire or L to the negative terminal and the positive wire or M N to the positive terminal Figure 25 Connecting the 650W DC power supply Verifying the insta...

Page 33: ...ess the switch you must use a console cable to connect a configuration terminal for example a PC to the console port on the switch Figure 26 Connecting the console port to a terminal Connecting the console cable A console cable is an 8 core shielded cable with a crimped RJ 45 connector at one end for connecting to the console port of the switch and a DB 9 female connector at the other end for conn...

Page 34: ...al ports on PCs do not support hot swapping To connect a PC to an operating switch first connect the PC end To disconnect a PC from an operating switch first disconnect the switch end Setting terminal parameters To configure and manage the switch through the console port you must run a terminal emulator program such as HyperTerminal or PuTTY on your configuration terminal You can use the emulator ...

Page 35: ...th the console port settings on the switch Procedure 1 Power on the switch During the startup process you can access Boot ROM menus to perform tasks such as software upgrade and file management The Boot ROM interface and menu options vary by software versions For more information about Boot ROM menu options see the release notes for the switch software 2 After the startup completes use the CLI to ...

Page 36: ...res and power cords See Grounding the switch on page 22 and Connecting the power cord on page 31 4 Power on the switches 5 Configure basic IRF settings See HPE 5920 5900 Switch Series IRF Configuration Guide 6 Connect the physical IRF ports on switches Use SFP or QSFP transceiver modules and fibers for long distance connection Use SFP or QSFP network cables for short distance connection All switch...

Page 37: ...fabric An IRF fabric has only one master switch You configure and manage all member switches in the IRF fabric at the command line interface of the master switch NOTE IRF member switches will automatically elect a master You can affect the election result by assigning a high member priority to the intended master switch For more information about master election see HPE 5920 5900 Switch Series IRF...

Page 38: ...Figure 29 IRF fabric in daisy chain topology Figure 30 IRF fabric in ring topology 38 Setting up an IRF fabric ...

Page 39: ...A 5900CP 48XG 4QSFP 5900CP 48XG 4QSFP TAA 5900CP 48XG 4QSFP 8Gb FC B F 5900AF 48XG 4QSFP and 5900AF 48XG 4QSFP TAA switches the SFP ports are grouped by port number in ascending order starting from one Every four SFP ports form one group On the HPE 5900AF 48G 4XG 2QSFP and 5900AF 48G 4XG 2QSFP TAA switches SFP ports numbered 49 50 51 and 52 form one group On the HPE 5900AF 48XGT 4QSFP and 5900AF 4...

Page 40: ...sa On the HPE 5920AF 24XG 5920AF 24XG TAA 5900CP 48XG 4QSFP 5900CP 48XG 4QSFP TAA 5900CP 48XG 4QSFP 8Gb FC B F 5900AF 48XG 4QSFP and 5900AF 48XG 4QSFP TAA switches the SFP ports are grouped by port number in ascending order starting from one Every four SFP ports form one group On the HPE 5900AF 48G 4XG 2QSFP and 5900AF 48G 4XG 2QSFP TAA switches SFP ports numbered 49 50 51 and 52 form one group On...

Page 41: ...on page 61 and QSFP port on page 64 HPE 5900AF 48XGT 4QSFP HPE 5900AF 48XGT 4QSFP TAA Twisted pair cables QSFP network cables QSFP transceiver modules and fibers 2 Review the following IRF connection schemes recommended by Hewlett Packard Enterprise These schemes use a ring topology Connecting the IRF member switches in one rack on page 41 Connecting the IRF member switches in a ToR solution on pa...

Page 42: ...ember priorities and IRF port bindings Procedure 1 Follow these guidelines when you configure the switches Assign the master switch higher member priority than any other switch Bind physical ports to IRF port 1 on one switch and to IRF port 2 on the other switch You perform IRF port binding before or after connecting IRF physical ports depending on the software release Execute the display irf conf...

Page 43: ...the network management station See HPE 5920 5900 Switch Series Fundamentals Configuration Guide 4 Verify that you can manage all member switches as if they were one node 5 Display the running status of the IRF fabric by using the commands in Task Command Display information about the IRF fabric display irf Display all members IRF configurations that take effect at a reboot display irf configuratio...

Page 44: ...upply has good ventilation 4 If the problem persists contact Hewlett Packard Enterprise Support Fan tray failure Symptom One or more fan trays fail CAUTION If one fan tray fails perform the following tasks Finish replacing the fan tray within 24 hours and do not remove the failed fan tray before replacement when the ambient temperature is below 27 C 80 6 F Replace the fan tray immediately when the...

Page 45: ...etting Value Baud rate 9600 Data bits 8 Parity None Stop bits 1 Flow control None 5 Verify that the console cable is not faulty 6 If the problem persists contact Hewlett Packard Enterprise Support Garbled display on the configuration terminal Symptom The configuration terminal displays garbled text Action 1 Verify that the following settings are configured for the terminal Setting Value Baud rate ...

Page 46: ...ibrary www hpe com info EIL Single Point of Connectivity Knowledge SPOCK Storage compatibility matrix www hpe com storage spock Storage white papers and analyst reports www hpe com storage whitepapers For additional websites see Support and other resources 46 Websites ...

Page 47: ...ates through the product interface Review your product documentation to identify the recommended software update method To download product updates Hewlett Packard Enterprise Support Center www hpe com support hpesc Hewlett Packard Enterprise Support Center Software downloads www hpe com support downloads Software Depot www hpe com support softwaredepot To subscribe to eNewsletters and alerts www ...

Page 48: ... Proactive Care information HPE Get Connected www hpe com services getconnected HPE Proactive Care services www hpe com services proactivecare HPE Proactive Care service Supported products list www hpe com services proactivecaresupportedproducts HPE Proactive Care advanced service Supported products list www hpe com services proactivecareadvancedsupportedproducts Proactive Care customer informatio...

Page 49: ...om info ecodata For Hewlett Packard Enterprise environmental information including company programs product recycling and energy efficiency see www hpe com info environment Documentation feedback Hewlett Packard Enterprise is committed to providing documentation that meets your needs To help us improve the documentation send any errors suggestions or comments to Documentation Feedback docsfeedback...

Page 50: ...for the slots as accessories You can install one or two power supplies for the switch as needed In this figure two 650W AC power supplies are installed For more information about installing and removing the power supply see Installing removing a power supply on page 27 The HPE 5920AF 24XG and 5920AF 24XG TAA switches also come with the fan tray slots empty You must install two fan trays for the HP...

Page 51: ...Front panel 1 SFP port 2 SFP port LED 3 QSFP port 4 QSFP port LED 5 System status LED SYS Figure 38 Rear panel 1 Grounding screw auxiliary grounding point 2 2 Management Ethernet port 3 Console port 4 Fan tray slot 1 5 Fan tray slot 2 6 Power supply slot 1 7 Power supply slot 2 8 LINK LED for the management Ethernet port 9 ACT LED for the management Ethernet port 10 USB port Chassis views and tech...

Page 52: ...FP 8Gb FC B F switches also come with the fan tray slots empty You must install two fan trays for the HPE 5900AF 48XG 4QSFP 5900AF 48XG 4QSFP TAA 5900CP 48XG 4QSFP 5900CP 48XG 4QSFP TAA and 5900CP 48XG 4QSFP 8Gb FC B F for adequate heat dissipation and their models must be the same In this figure two LSWM1FANSC fan trays are installed For more information about installing and removing the fan tray...

Page 53: ...gure two 650W AC power supplies are installed For more information about installing and removing the power supply see Installing removing a power supply on page 27 The HPE 5900AF 48XGT 4QSFP and 5900AF 48XGT 4QSFP TAA switches also come with the fan tray slots empty You must install two fan trays for the HPE 5900AF 48XGT 4QSFP and 5900AF 48XGT 4QSFP TAA switches for adequate heat dissipation and t...

Page 54: ... with the power supply slots empty and the filler modules for the slots as accessories You can install one or two power supplies for the switch as needed In this figure two 650W AC power supplies are installed For more information about installing and removing the power supply see Installing removing a power supply on page 27 The HPE 5900AF 48G 4XG 2QSFP and 5900AF 48G 4XG 2QSFP TAA switches also ...

Page 55: ...1 in 43 6 440 660 mm 1 72 17 32 25 98 in Weight 13 5 kg 29 76 lb 13 kg 28 66 lb 10 kg 22 05 lb 13 kg 28 66 lb Console ports 1 1 1 1 Management Ethernet ports 1 1 1 1 USB ports N A 1 1 1 SFP ports 24 48 4 N A QSFP ports N A 4 2 4 10 100 1000B ase T autosensing Ethernet ports N A N A 48 N A 1 10GBase T autosensing Ethernet ports N A N A N A 48 Fan tray slots 2 hot swappable on the rear panel 2 hot s...

Page 56: ... VDC Max voltage 40 VDC to 72 VDC Rated voltage 40 VDC to 60 VDC Max voltage 40 VDC to 72 VDC Minimum power consumption Single AC input 334 W Dual AC inputs 343 W Single DC input 333 W Dual DC inputs 339 W Single AC input 183 W Dual AC inputs 200 W Single DC input 182 W Dual DC inputs 197 W Single AC input 98 W Dual AC inputs 115 W Single DC input 95 W Dual DC inputs 110 W Single AC input 124 W Du...

Page 57: ...VDC 10 A 250 VAC 30 A 250 VDC 10 A 250 VAC 30 A 250 VDC 10 A 250 VAC 30 A 250 VDC Operating temperature 0 C to 45 C 32 F to 113 F 0 C to 45 C 32 F to 113 F 0 C to 45 C 32 F to 113 F 0 C to 45 C 32 F to 113 F Operating humidity 10 to 90 noncondensing 10 to 90 noncondensing 10 to 90 noncondensing 10 to 90 noncondensing Fire resistance compliance UL60950 1 EN60950 1 IEC60950 1 GB4943 UL60950 1 EN6095...

Page 58: ...A HPE A58x0AF 650W AC JC680A 650W DC JC681A Power Supplies User Guide or HPE FlexFabric Switch 650W 48V Hot Plug NEBS Compliant DC Power Supply JH336A User Guide 640 W DC power supply Rated input voltage 40 VDC to 60 VDC Max input voltage 40 VDC to 72 VDC Max output power 650 W IMPORTANT Do not install AC and DC power supplies on the same switch When a switch has two power supplies for redundancy ...

Page 59: ...SC for the HPE 5900AF 48XGT 4QSFP and 5900AF 48XGT 4QSFP TAA switches Fans Two 40 40 56 mm 1 57 1 57 2 2 in fans Fan speed 21000 R P M Max airflow 70 CFM Airflow direction Back to front Fans draw air from the power supply side to the network port side Input voltage 12 V Maximum power consumption 60 W Documentation reference HPE LSWM1HFANSC LSWM1HFANSCB Installation Manual LSWM1HFANSCB for the HPE ...

Page 60: ...nstallation Manual LSVM1FANSCB for the HPE 5920AF 24XG and 5920AF 24XG TAA switches Fans Three 40 40 28 mm 1 57 1 57 1 1 in fans Fan speed 18500 RPM Max airflow 57 CFM Airflow direction Front to back Fans draw air from the network port side to the power supply side Input voltage 12 V Maximum power consumption 22 7 W Documentation reference HPE LSVM1FANSC LSVM1FANSCB Fan Assemblies Installation Man...

Page 61: ...cifications Connector type RJ 45 Connector quantity 1 Transmission medium and max transmission distance 10 100 1000 Mbps half full duplex Functions and services Switch software and Boot ROM upgrade network management USB port Every HPE 5900 switch has one OHC compliant USB2 0 port that can upload and download data at a rate up to 12 Mbps You can use this USB port to access the file system on the F...

Page 62: ...al ports to connect the switches in an IRF deployment Table 8 1000 Mbps SFP transceiver modules available for the SFP ports Product code HPE description Central wavelengt h nm Connector Cable fiber diameter μm Modal bandwidth MHz x km Max transmission distance JD089B HPE X120 1G SFP RJ45 T Transceiver N A RJ 45 Category 5 twisted pair N A 100 m 328 08 ft JD118B HPE X120 1G SFP LC SX Transceiver 85...

Page 63: ...C SR Transceiver 850 LC Multi mode 50 125 2000 300 m 984 25 ft 500 82 m 269 03 ft 400 66 m 216 54 ft Multi mode 62 5 125 200 33 m 108 27 ft 160 26 m 85 3 ft JD093B HPE X130 10G SFP LC LRM Transceiver 1310 Lc Multi mode 50 125 1500 500 220 m 721 78 ft 400 100 m 328 08 ft Multi mode 62 5 125 200 160 220 m 721 78 ft JD094B HPE X130 10G SFP LC LR Transceiver 1310 LC Single mode 9 125 N A 10 km 6 21 mi...

Page 64: ...PE 5900AF 48G 4XG 2QSFP TAA switches do not support the SFP XG LX220 MM1310 transceiver module QSFP port HPE 5900 switches provide QSFP ports You can plug the QSFP transceiver modules in Table 11 40G QSFP transceiver modules available for the HPE 5900 switches on page 64 and the QSFP network cables in Table 12 40G QSFP network cables available for the HPE 5900 switches on page 65 in the QSFP ports...

Page 65: ...on Max transmission distance JG326A HPE X240 40G QSFP QSFP 1m Direct Attach Copper Cable 1 m 3 28 ft JG327A HPE X240 40G QSFP QSFP 3m Direct Attach Copper Cable 3 m 9 84 ft JG328A HPE X240 40G QSFP QSFP 5m Direct Attach Copper Cable 5 m 16 40 ft JG329A HPE X240 40G QSFP to 4x10G SFP 1m Direct Attach Copper Splitter Cable 1 m 3 28 ft JG330A HPE X240 40G QSFP to 4x10G SFP 3m Direct Attach Copper Spl...

Page 66: ...ckard Enterprise sales representative or technical support engineer You can use an HPE X140 40G QSFP MPO SR4 transceiver JG325B or HPE X140 40G QSFP MPO MM 850nm CSR4 300m transceiver JG709A to connect a QSFP port to four SFP ports The QSFP transceiver module and SFP transceiver modules to be connected must be the same in specifications including central wavelength and fiber type 10 100 1000Base T...

Page 67: ...ab IEEE 802 3an To avoid interference between cables layer cables as follows Use category 6A or above twisted pair cables and connectors Do not bundle cables in their first 20 m 65 62 ft Separate power cables and twisted pair cables at and around the distribution frame For ports adjacent to one another on the device the peer ports on the distribution frame is preferably not adjacent for example If...

Page 68: ... The port has a link and is operating at 1 Gbps Flashing yellow The port is sending or receiving data at 1 Gbps Off No transceiver module or cable has been installed or no link is present on the port Flashing yellow The port is sending or receiving data at 2 Gbps or 4 Gbps Off No transceiver module or cable has been installed or no link is present on the port QSFP port LED Each QSFP port has a sta...

Page 69: ...hernet port LED description LED status Description Steady green The port has a link and is operating at 1000 Mbps Flashing green The port is sending or receiving data at 1000 Mbps Steady yellow The port has a link and is operating at 10 100 Mbps Flashing yellow The port is sending or receiving data at 10 100 Mbps Off No link is present on the port 1 10GBase T autosensing Ethernet port LEDs Table 2...

Page 70: ...he fan tray panel and the power supply panels circulates through the chassis and the power supplies and exhausts at the network port side as shown in Figure 49 Airflow through the chassis with LSVM1FANSC fan trays on page 70 When LSVM1FANSCB fan trays are used cool air flows in through the air vents in the network port side panel and the power supply panels circulates through the chassis and the p...

Page 71: ... trays on page 71 describes fan trays available for the HPE 5900 switches Table 21 Compatibility matrix between the HPE 5900 switch models and fan trays Fan tray HPE 5900 switch model LSWM1FANSC LSWM1FANSCB HPE 5900AF 48XG 4QSFP HPE 5900AF 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP HPE 5900CP 48XG 4QSFP TAA HPE 5900CP 48XG 4QSFP 8Gb FC B F HPE 5900AF 48G 4XG 2QSFP HPE 5900AF 48G 4XG 2QSFP TAA LSWM1HFANS...

Page 72: ... cool air flows in through the air vents in the network port side panel and the power supply panels circulates through the chassis and the power supplies and exhausts through the air vents in the fan tray panels as shown in Figure 52 Airflow through the HPE 5900AF 48XG 4QSFP chassis with LSWM1FANSCB fan trays on page 72 Figure 51 Airflow through the HPE 5900AF 48XG 4QSFP chassis with LSWM1FANSC fa...

Page 73: ... 1 Power supply air vents 2 Fan tray air vents 3 Network port side air vents IMPORTANT The chassis and the power supplies use separate air aisles Make sure both aisles are not blocked Cooling system 73 ...

Page 74: ...re brackets enclose a set of optional syntax choices separated by vertical bars from which you select one or none x y Asterisk marked braces enclose a set of required syntax choices separated by vertical bars from which you select at least one x y Asterisk marked square brackets enclose optional syntax choices separated by vertical bars from which you select one choice multiple choices or none 1 n...

Page 75: ...uch as a router switch or firewall Represents a routing capable device such as a router or Layer 3 switch Represents a generic switch such as a Layer 2 or Layer 3 switch or a router that supports Layer 2 forwarding and other Layer 2 features Represents an access controller a unified wired WLAN module or the access controller engine on a unified wired WLAN switch Represents an access point Represen...

Reviews: