Chapter 2. Installation
3.
As shown in
, connect the phone cord to the left RJ-11 adapter (LINE) at the
rear of the appliance and to a facility telephone connection.
Powering On the HAFM Appliance
To power on the HAFM appliance:
Warning
Use the supplied power cords. Ensure the facility power receptacle is the correct type,
supplies the required voltage, and is properly grounded.
1.
As shown in
, connect the AC power cord to the appliance and to a facility
power source or rack power strip that provides single-phase, 90 to 264 VAC current.
When the power cord is connected, the appliance powers on and performs power-on
self-tests (POSTs). During POSTs:
a.
The green liquid crystal display (LCD) panel illuminates.
b.
The green hard disk drive (HDD) LED blinks momentarily, and processor speed and
random-access memory information display momentarily at the LCD panel.
c.
After a few seconds, the LCD panel displays the following message pertaining to
boot sequence selection (
Figure 2.8. LCD Panel During Boot Sequence
d.
Ignore the message. After ten seconds, the appliance performs the boot sequence
from the basic input/output system (BIOS). During the boot sequence, the appliance
performs additional POSTs and displays the following operational information at
the LCD panel:
•
Host name.
•
System date and time.
•
LAN 1 and LAN 2 Internet Protocol (IP) addresses.
•
Rotational speed status on multiple appliance fans.
•
Central Processing Unit (CPU) Temp
•
Hard disk capacity
32
hp StorageWorks HA-Fabric Manager Appliance Installation
Guide