background image

HP StorageWorks 

2/8q Fibre Channel 

Switch

Quick Start

HP StorageWorks 2/8q FC Switch Quick Start 

Installation Instructions

First Edition (November 2004)

Part Number: A7450-96001

© 

Copyright 2004 Hewlett-Packard Development Company, L.P.

Hewlett-Packard Company makes no warranty of any kind with regard to 

this material, including, but not limited to, the implied warranties of 

merchantability and fitness for a particular purpose. Hewlett-Packard shall 

not be liable for errors contained herein or for incidental or consequential 

damages in connection with the furnishing, performance, or use of this 

material.
This document contains proprietary information, which is protected by 

copyright. No part of this document may be photocopied, reproduced, 

or translated into another language without the prior written consent of 

Hewlett-Packard. The information contained in this document is subject to 

change without notice.
Product names mentioned herein may be trademarks of their respective 

companies as reflected by an associated footnote.
Hewlett-Packard Company shall not be liable for technical or editorial 

errors or omissions contained herein. The information is provided “as is” 

without warranty of any kind and is subject to change without notice. The 

warranties for Hewlett-Packard Company products are set forth in the 

express limited warranty statements for such products. Nothing herein 

should be construed as constituting an additional warranty.
Printed in the U.S.A. 

Installation 

Instructions

For additional instructions, refer to the 

2/8q FC Switch Installation Guide and 

the MSA1000 Small Business SAN Kit 

Installation poster.

A7 4 5 0 - 9 6 0 0 1

Step 1: Verify package contents

Note:  

Additional power cables approved for use in countries other 

than the United States may be included in the shipping carton. Use 

the cable appropriate for your installation.

Step 2: Identify switch features

Note:  

Do not connect power to the switch until instructed in step 5. 

1

2/8q FC Switch

2

Quick Start Installation Instructions 
(this document)

3

Power cable 
(approved for use in the United States)

4

Mounting adapter brackets and screws

5

Rubber feet

6

Small Form Factor Pluggable (SFP) transceivers 

1

Power receptacle

2

Serial port

3

Ethernet port

4

Chassis LEDs 
(Input Power, Heartbeat, and System Fault)

5

Fibre Channel port LEDs 
(Port Logged-In and Activity)

6

Fibre Channel port 0

1

3

2

6

5

4

1

2

3

4

5

6

Reviews: