Chapter 3
• Creating Synchronization Links
78
6
In the
Direction
box, select the direction for the field value mapping. The
following options are available:
➤
<---->.
Occurrences of the value in the
Endpoint 1 Value
box are mapped
to the value in the
Endpoint 2 Value
box. Occurrences of the value in the
Endpoint 2 Value
box are mapped to the value in the
Endpoint 1 Value
box.
➤
---->.
Occurrences of the value in the
Endpoint 1 Value
box are mapped to
the value in the
Endpoint 2 Value
box, but occurrences of the value in
the
Endpoint 2 Value
box are not mapped to the value in the
Endpoint 1
Value
box.
➤
<----.
Occurrences of the value in the
Endpoint 2 Value
box are mapped to
the value in the
Endpoint 1 Value
box, but occurrences of the value in
the
Endpoint 1 Value
box are not mapped to the value in the
Endpoint 2
Value
box.
Click
OK
.
Note:
You can map one or more field values in the source endpoint to a
single field value in the destination endpoint, but not vice versa.
7
To edit a mapping between field values, select the mapping and click the
Edit Value Mapping
button. In the Add Value Mapping dialog box, edit the
mapping and click
OK
.
8
To remove a mapping between field values, select the mapping and click the
Delete Value Mapping
button.