Hardware options installation 69
11.
Install the GPU cage.
12.
Install the interposer board (on page
13.
Install the front GPU cage (on page
14.
Install the server into the chassis ("
Installing the server into the chassis
" on page
15.
Connect all peripheral cables to the server.
16.
Power up the server.
Connecting the SUV cable
CAUTION:
Before disconnecting the SUV cable from the connector, always squeeze the release
buttons on the sides of the connector. Failure to do so can result in damage to the equipment.
Item
Connector
Description
1
SUV port
SUV port on the server front panel
2
SUV connector
For connecting to the SUV connector on the
server front panel
3
Video
For connecting a video monitor
4
USB
For connecting up to two USB devices
5
Serial
For trained personnel to connect a null modem
serial cable and perform advanced diagnostic
procedures
Redundant hot-plug power supply option
CAUTION:
All power supplies installed in the server must have the same output power capacity.
Verify that all power supplies have the same part number and label color. The system becomes
unstable and may shut down when it detects mismatched power supplies.
Summary of Contents for ProLiant SL250s Gen8
Page 6: ...Contents 6 Acronyms and abbreviations 112 Documentation feedback 116 Index 117 ...
Page 55: ...Hardware options installation 55 o Left node o Right node ...
Page 76: ...Cabling 76 SFF hot plug drive cage Front quick release cage Left node ...
Page 77: ...Cabling 77 Right node Rear quick release drive cage Left node ...
Page 80: ...Cabling 80 Mini SAS cabling SFF hot plug drive cage Front quick release drive cage Left node ...
Page 81: ...Cabling 81 Right node Rear quick release drive cage Left node ...
Page 82: ...Cabling 82 Right node FBWC capacitor pack cabling Left node ...
Page 83: ...Cabling 83 Right node ...
Page 110: ...Support and other resources 110 ...
Page 111: ...Support and other resources 111 ...