Hardware options installation 56
14.
Install the FBWC capacitor pack into the holder mounted in the server tray.
15.
Install the front GPU bracket (on page
16.
Install the interposer board (on page
17.
Install the front GPU cage (on page
18.
Install the SFF hot-plug drive cage ("
Installing the SFF hot-plug drive cage
" on page
19.
Install the server into the chassis ("
Installing the server into the chassis
" on page
20.
Connect all peripheral cables to the server.
21.
Power up the server.
Smart Array enablement Mini-SAS cable option
1.
Power down the server (on page
2.
Disconnect all peripheral cables from the server.
3.
Remove the server from the chassis (on page
4.
Remove the SFF hot-plug drive cage ("
Removing the SFF hot-plug drive cage
" on page
5.
Remove the front GPU cage (on page
6.
Remove the interposer board (on page
7.
Remove the front GPU bracket (on page
8.
Remove the PCI riser cage (on page
9.
Install the storage controller ("
" on page
Summary of Contents for ProLiant SL250s Gen8
Page 6: ...Contents 6 Acronyms and abbreviations 112 Documentation feedback 116 Index 117 ...
Page 55: ...Hardware options installation 55 o Left node o Right node ...
Page 76: ...Cabling 76 SFF hot plug drive cage Front quick release cage Left node ...
Page 77: ...Cabling 77 Right node Rear quick release drive cage Left node ...
Page 80: ...Cabling 80 Mini SAS cabling SFF hot plug drive cage Front quick release drive cage Left node ...
Page 81: ...Cabling 81 Right node Rear quick release drive cage Left node ...
Page 82: ...Cabling 82 Right node FBWC capacitor pack cabling Left node ...
Page 83: ...Cabling 83 Right node ...
Page 110: ...Support and other resources 110 ...
Page 111: ...Support and other resources 111 ...