
Operations 23
Installing the SFF hot-plug drive cage
1.
Install the SFF hot-plug drive cage.
2.
Connect the power and Mini-SAS cables to the drive backplane.
3.
Install the server into the chassis ("
Installing the server into the chassis
" on page
4.
Connect all peripheral cables to the server.
5.
Power up the server.
Remove the PCI riser cage
1.
Power down the server (on page
2.
Disconnect all peripheral cables from the server.
3.
Remove the server from the chassis (on page
4.
Remove the SFF hot-plug drive cage ("
Removing the SFF hot-plug drive cage
" on page
5.
Remove the front GPU cage (on page
6.
Remove the interposer board (on page
7.
Remove the front GPU bracket (on page
8.
Remove the PCI riser cage:
a.
Loosen the thumbscrew securing the PCI riser, and then remove the screws securing the PCI riser
cage.
Summary of Contents for ProLiant SL250s Gen8
Page 6: ...Contents 6 Acronyms and abbreviations 112 Documentation feedback 116 Index 117 ...
Page 55: ...Hardware options installation 55 o Left node o Right node ...
Page 76: ...Cabling 76 SFF hot plug drive cage Front quick release cage Left node ...
Page 77: ...Cabling 77 Right node Rear quick release drive cage Left node ...
Page 80: ...Cabling 80 Mini SAS cabling SFF hot plug drive cage Front quick release drive cage Left node ...
Page 81: ...Cabling 81 Right node Rear quick release drive cage Left node ...
Page 82: ...Cabling 82 Right node FBWC capacitor pack cabling Left node ...
Page 83: ...Cabling 83 Right node ...
Page 110: ...Support and other resources 110 ...
Page 111: ...Support and other resources 111 ...