Hardware Options Installation
5.
Connect any cables to the expansion board.
6.
Reinstall the expansion board retainer by reversing step 3.
7.
Replace the access panel and front bezel.
To remove an expansion board, reverse steps 1 through 7.
Memory Modules
Technical Information and Important Guidelines
CAUTION: To prevent damage to equipment or loss of information, be sure that the
server is powered down, all cables are disconnected from the back of the server, and
the power cord is disconnected from the grounded (earthed) AC outlet before
removing the access panel.
CAUTION: Electrostatic discharge (ESD) can damage electronic components. Be
sure that you are properly grounded (earthed) before beginning any installation
procedure. Refer to Appendix B, “Electrostatic Discharge,” for more information.
CAUTION: When handling a DIMM, be careful not to touch any of the contacts.
Doing so may damage the component.
When installing DIMMs, you must follow these guidelines:
Memory modules must be industry-standard, ECC Registered PC2100 DDR
SDRAM DIMM and support CAS Latency 2.5 (CL=2.5).
·
·
·
Do not mix ECC and non-ECC SDRAM DIMMs. If different types of DIMMs
are mixed, the server will not properly function.
128-MB, 256-MB, 512-MB, and 1-GB DIMMs are supported.
HP ProLiant ML310 Server Setup and Installation Guide
3-27
HP CONFIDENTIAL
Writer: Ted Weiman File Name: d-ch3.doc
Codename: Son of Beast Part Number: 274431-002 Last Saved On: 11/22/02 1:58 PM