
Operations 28
5.
Install the PCI riser cage.
6.
Install the access panel (on page
7.
Install the server into the rack ("
Installing the server into the rack
" on page
8.
Connect each power cord to the server.
9.
Connect each power cord to the power source.
10.
Secure the full-length expansion board retainer
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend the server from the rack (on page
4.
Remove the access panel (on page
5.
Install a full-length expansion board ("
Installing a full-length expansion board
" on page
6.
Summary of Contents for ProLiant DL388p
Page 44: ...Hardware options installation 44 14 Install the heatsink 15 Remove the two fan blanks ...
Page 83: ...Cabling 83 LFF hard drive cabling Optical drive cabling ...
Page 84: ...Cabling 84 FBWC cabling 8 or 16 drive SFF 8 drive LFF PCIe option ...
Page 120: ...Technical support 120 ...
Page 121: ...Technical support 121 ...