Hardware options installation 44
6.
Connect the cable to the cache module.
7.
Install the battery pack.
8.
Route the cable ("
BBWC battery pack or FBWC capacitor pack cabling to an optional controller
" on
page
51
).
9.
Install the access panel.
10.
Install the server into the rack.
HP Trusted Platform Module option
Use these instructions to install and enable a TPM on a supported server. This procedure includes three
sections:
1.
Installing the Trusted Platform Module board.
2.
Retaining the recovery key/password (on page
46
).
3.
Enabling the Trusted Platform Module (on page
47
).