background image

    1

HP ProCurve 6600 Switch

4-Post Rack Mount Kit

Installation Instructions

The 4-Post Rack Mount Kit (J9469A) is designed to stabilize and support an HP ProCurve 6600 Switch 
that is mounted in a four-post rack. The following types of four-post racks are supported:

Vertical posts with square mounting holes: EIA 310-d hole size (0.375 in x 0.375 in). The 
screws and pins for square-hole posts are pre-installed on the rails.

Vertical posts with round mounting holes; round-hole size is from 7.2 to 7.3 mm in diameter. 
The screws and pins for round-hole posts are shipped in the accessory bag with the kit.

To install the 4-Post Rack Mount, follow these steps:

1.

Install the rails in the rack.

2.

Install the switch on the rails. 

3.

Connect and route the power cables (including an air plenum for power-side mounting).

4.

Secure the switch to the rack. 

1. Install the rails in the rack.

a.

Determine the height in the rack at which you want to mount the switch. Align the mounting 
holes at each end of a rail with the holes on the front and back rack posts so that they are 
at the same height. 

For a square-hole rack, leave the pre-installed square-hole pin in each rail. Unscrew and re-
install the 10-32 screw on each rail to secure it to the rack. (For a square-hole Panduit rack 
with grounding strips, unscrew the 10-32 screws and install the green grounding screws 
(5183-2026) shipped with the 4-Post Rack Mount Kit.)

For a round-hole rack, install the alternate round-hole pins that are shipped with the kit to 
set the rails in the rack. Install the alternate round-hole screws to secure the rails. (The round-
hole screws have a different shoulder than the square-hole screws.)

Figure 1.

Attaching Rails to a Rack 

Install a 10-32 shoulder screw in the top hole.

Use an alignment pin in the bottom hole to 
align each rail.

Summary of Contents for ProCurve 6600-48G-4XG

Page 1: ...ounting 4 Secure the switch to the rack 1 Install the rails in the rack a Determine the height in the rack at which you want to mount the switch Align the mounting holes at each end of a rail with the holes on the front and back rack posts so that they are at the same height For a square hole rack leave the pre installed square hole pin in each rail Unscrew and re install the 10 32 screw on each r...

Page 2: ...the switch is fully inserted and the mounting hole in each bracket lines up with the mounting holes in the rack Figure 3 Installing the Switch in the Rack Important In a port side or power side mounting you must ensure that the air flow direction is from the cold side to the hot side of the aisle If necessary reverse the direction of the fans to provide adequate switch cooling as described in Chap...

Page 3: ...two sizes Both plenums are installed in the same way J9480A is the shorter air plenum for 6600 24XG 6600 48G and 6600 48G 4XG Switches J9481A is the longer air plenum for 6600 24G and 6600 24G 4XG Switches Slide the plenum into the rails until the plenum is fully inserted and the two mounting holes align with the mounting holes on the bracket and rack Figure 4 Installing the Plenum Figures 5 and 6...

Page 4: ... over the switch in either a single or stacked switch installation When you mount a pair of 6600 switches so that one is on top of the other the opening in the bottom of each plenum allows you to route the power cord up and through it Port side mounting for a 6600 Switch Option 3 Power side mountingfora 6600Switch Option1or 2 Install and tighten a 10 32 screw in the middle hole Copyright 2009 Hewl...

Reviews: