background image

Standard Operation Procedure

Document No. : NAIROBI FA DIS ASS’Y SOP 

Station

:

Name

:                                                                Ver. :    

Date

:

Step

Disassemble CPU

1. Disassemble the CPU by slot screwdriver and

vacuum pen.

8(1/1)

0.1

2012/10/30

Before

Fig.1

After

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard)

Qty

Holding fixture list (holding fixture standard)

Qty

Tabulator

Issue department

Alicia Chien

NPSU-SE

Fig.2

Slot screwdriver 

1

Vacuum Pen 

1

Summary of Contents for mt40

Page 1: ...Quantity of items included in product Printed Circuit Boards PCB or Printed Circuit Assemblies PCA With a surface greater than 10 sq cm 6 Batteries All types including standard alkaline and lithium coin or button style batteries 2 Mercury containing components For example mercury in lamps display backlights scanner lamps switches batteries 0 Liquid Crystal Displays LCD with a surface greater than ...

Page 2: ...on 1 Cross head of screwdriver Description 2 TORX T8 2 31mm Description 3 Description 4 Description 5 3 0 Product Disassembly Process 3 1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment 1 Follow steps described in Disassembly instruction file attached 2 If parts can be removed without using a tool remove it first 3 Use correct...

Page 3: ...ry knob to the left then remove the battery Fig 1 1 1 1 Battery knob 0 1 2012 10 30 Before After Fig 1 1 2 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Fig 2 ...

Page 4: ...he cover knob to the left then remove the cover Fig 1 2 1 1 0 1 2012 10 30 Before After Fig 1 1 2 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Fig 2 ...

Page 5: ...2 Remove the HDD 3 1 1 0 1 2012 10 30 1 3 2 Before After Fig 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Fig 2 Electric cross screwdriver 0 1 HDD assistant fixture 1 ...

Page 6: ...ew 2 then remove the FAN Fig 1 4 1 1 0 1 2012 10 30 1 2 Before Fig 1 After Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Fig 2 Electric cross screwdriver 1 1 ...

Page 7: ...s 1 Loosen keyboard set screw 3 Fig 1 5 1 1 0 1 2 1 3 2012 10 30 Fig 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Electric cross screwdriver 1 1 ...

Page 8: ... 6 1 1 0 1 Fig 1 2012 10 30 1 Disassemble the K B FPC Fig 2 2 Turn the computer over Fig 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Fig 2 ...

Page 9: ...12 10 30 1 2 3 4 Intel DIS 6 5 1 Loosen thermal screw 6 2 Remove the thermal Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Electric cross screwdriver 1 1 ...

Page 10: ... by slot screwdriver and vacuum pen 8 1 1 0 1 2012 10 30 Before Fig 1 After Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Fig 2 Slot screwdriver 1 Vacuum Pen 1 ...

Page 11: ...crews B series 4 screws PW series 5 screws 9 1 1 0 1 如Fig 1 1 2 3 2012 10 30 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE 4 5 Electric cross screwdriver 1 ...

Page 12: ... Loosen ODD set screw 1 2 Remove the ODD 10 1 1 0 1 2012 10 30 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Electric cross screwdriver 1 1 ...

Page 13: ...1901 2 Fig 1 2 Pull out the speaker CNTR Fig 2 11 1 1 0 1 2012 10 30 1 2 On the side of ODD Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Electric cross screwdriver 1 1 Fig 1 Fig 2 ...

Page 14: ...6052B0155201 4 Fig 1 Fig 2 12 1 1 0 1 2012 10 30 1 3 2 4 Fig 1 Fig 2 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Electric torx screwdriver T8 1 Support fixture 1 ...

Page 15: ...1 Loosen BTCB screw 6052B0155201 4 13 1 1 0 1 4 2012 10 30 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE 2 3 Electric torx screwdriver T8 1 ...

Page 16: ... Loosen BTCB screw 6052B0155201 4 14 1 1 0 1 1 4 2012 10 30 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE 1 3 2 Electric torx screwdriver T8 1 ...

Page 17: ...CB 2 Must be sure there is a pad on the north bridge then attach a release paper to it Fig 2 3 Put the BTCB in material box Fig 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Fig 2 ...

Page 18: ...Date Step Disassemble DDRs 1 Remove all DDRs 16 1 1 0 1 2012 10 30 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE ...

Page 19: ... WLAN screw 6052A0004501 2 2 Remove the WLAN card 17 1 1 0 1 2012 10 30 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE 2 Electric cross screwdriver 0 1 ...

Page 20: ... Sensor B marked in red circle 2 Disassemble the cable from routing rib marked in white circle 18 1 1 0 1 圖一 2012 10 30 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE ...

Page 21: ...out LCM CNTR and camera cable CNTR Fig 1 2 Disassemble F P dummy 19 1 1 0 1 2012 10 30 Fig 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE NG Fig 2 ...

Page 22: ... battery from routing rib Fig 2 Loosen M B Screws 20 1 1 0 1 2012 10 30 1 2 3 Fig 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Fig 2 Electric cross screwdriver 1 1 ...

Page 23: ...ate Step 1 Take out the M B Take out the M B 21 1 1 0 1 2012 10 30 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE ...

Page 24: ...ble the 4 cables from routing rib Fig 1 2 Loosen screw 2 Fig 2 Fig 3 1 2 Fig 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Fig 2 Fig 3 Electric cross screwdriver 1 1 ...

Page 25: ...y wrench 2 Disassemble the top case Disassemble Top Case 23 1 1 0 1 2012 10 30 Fig 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Wrench 1 Fig 2 Fig 3 ...

Page 26: ... Step Disassemble RJ11 1 Disassemble RJ11 dummy 24 1 1 0 1 2012 10 30 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE ...

Page 27: ...semble the speaker 25 1 1 0 1 2012 10 30 Fig 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE 1 2 DO NOT DO NOT DO NOT DO NOT PRESS PRESS PRESS PRESS Fig 2 Electric cross screwdriver 0 1 ...

Page 28: ...utton Fig 1 Check the bracket Fig 2 Check the thermal pad Fig 3 26 1 1 0 1 2012 10 30 NO HOT MELT NG Fig 1 Notes If finding anything uncommon notice foreman or assistant at once Holding fixture list holding fixture standard Qty Holding fixture list holding fixture standard Qty Tabulator Issue department Alicia Chien NPSU SE Fig 2 Fig 3 ...

Reviews: