
Operation Instruction
Document No. : silverbell LCM Dismantling SOP
Work station
:
Operation item
: Ver. :
Date :
Jig list(Jig specification)
QTY
Jig list(Jig specification)
QTY
Steps
:
Attention
︰
If abnormal condition happens, please contact foreman or assistant immediately.
Department
:
Tabulation
:
Huang.Ya-jun
IE
13(1/1)
Dismantling camera
1.00
1. Unfold the acetic acid
mausoleum,pull the EDP cable
connector from the camera.
2. Dismantling
camera and recovery.
2019/9/18