Chapter 4
Cabling and Power Up
Voltage Check (Additional Procedure)
47
WARNING
Do not set site AC circuit breakers serving the processor cabinets to
ON
before verifying that the cabinet has been wired into the site AC power
supply correctly. Failure to do so might result in injury to personnel or
damage to equipment when AC power is applied to the cabinet.
Step 9.
Set the site power circuit breaker to
ON
.
WARNING
SHOCK HAZARD
Risk of shock hazard while testing primary power.
Use properly insulated probes.
Be sure to replace access cover when finished testing primary power.
Step 10.
Set the server power to
ON
.
Step 11.
Check that the indicator light on each power supply is lit.
Summary of Contents for 9000 rp7420
Page 4: ...Contents iv Index 67 ...
Page 6: ...Tables vi ...
Page 8: ...Figures viii ...
Page 74: ...Chapter 4 Cabling and Power Up Using the Checklist 66 ...