Hoyt H2731PU Instruction Manual Download Page 4

-2-

2. Specifications

Voltage Settings  

 

500Vdc

(Internal Jumpers  

 

1000Vdc

Selectable) 

 

  2500Vdc

    5000Vdc 

(Default 

Setting)

Over-Current Protection  

Yes

Power On Indicator  

 

Yes

Operating Temperature   

-5°C to 45°C

Storage Temperature    

-10°C to 85°C

Battery   

 

 

6 x AA batteries ALKALINE

The High Voltage Proving Unit for High Voltage testers 

is utilized to determine if the devices under test are 

functionally working.

The High Voltage Proving Unit is not a calibrator and 

can’t be utilized for calibration.

The High Voltage Proving Unit for High Voltage testers 

can be utilized to proof contact devices on a momentary 

basis (press on, check, release).

Summary of Contents for H2731PU

Page 1: ...HIGH VOLTAGE PROVING UNIT INSTRUCTION MANUAL...

Page 2: ...Specifications 3 Features 4 Connections 5 Layout of Tester 6 Instructions Label 7 Proofing Methods 8 Preparation for Proofing 9 Battery Replacement 10 Servicing and Calibration 11 Cleaning and Storag...

Page 3: ...ent 1 3 Always inspect your High Voltage Proving Unit for Voltage Testers and test leads before use for any sign of abnormality or damage If any abnormal conditions exist broken test leads cracked cas...

Page 4: ...ature 10 C to 85 C Battery 6 x AA batteries ALKALINE The High Voltage Proving Unit for High Voltage testers is utilized to determine if the devices under test are functionally working The High Voltage...

Page 5: ...not to be used with non contact proximity detectors High Voltage Testers Battery Operated Led indicates when Power is ON Small and Hand Held Quick connection with normal 4mm Test Leads Comes in a pouc...

Page 6: ...4 1 3 5 2 4 1 On and Test Button Switch 2 Power On Indicator 3 Instruction Label 4 Master Pole Connection 5 Slave Pole Earth wire connection 5 Layout of Tester...

Page 7: ...6 Instruction Label 5...

Page 8: ...tage detector must lit and the panel meter must deviate and show increase in the voltage then come back down Proofing PE xxk Voltage Testers The Master Pole must be connected to the positive socket of...

Page 9: ...for short period of time only Proving second source equivalents or compatible models 8 Preparation for Proving Before testing Always Check the Following At Power ON check The led lit If the led does...

Page 10: ...HECKED every year by an professional Workshop 11 Cleaning and Storage Periodically wipe the case with a damp cloth and detergent do not use abrasives or solvents If meter is not to be used for periods...

Reviews: