DTU-W100
www.hoymiles.com
11
c.
Customer will able to view all details once the data start to upload, normally it will need
around 30 mins for the first data coming through.
d.
Customer can also view the Microinverter generating details via accessing the HMP
monitoring platform website at
6. Complete Installation Map
When the system is energized and the DTU detects the microinverters, you need complete the
installation map.
a.
Peel the serial number label from the DTU and place it on the installation map.
b.
Complete system information of the installation map shown as follows.
7. Browse the Web Station
You can view the inverter real time operating details on computer web page by access Hoymiles