Important Notes:

Shaker Wall Panelling

SWPLE1

Components supplied 

(per pack)

Installation

Fix the anchor point section to the wall using adhesive.

This can be positioned in a corner of the room, door opening or centre

of the wall (for symmetrical layout). If the run is less than 2m in length

always start from the wall.

Note: 

Anchor point must be straight/level. 

x5 Wall Panel - 800 x 441mm

x1 End Stile - 800 x 100mm

Corner of room start point application shown

Anchor Section

Adhesive

Strip

Panel Back

Adhesive

*supplied separately

Skirting

Board*

Architrave/Dado*

Shaker Panelling

(800mm)

1

3

Mark the height of the panel from the lowest

point. Place the first panel against the wall aligning

with the anchor section to ensure square and level.

2

Fit all panelling to the wall.

HD715081

Ensure packaging is disposed of in a safe

 environmentally friendly way.

Remove packaging and place panels in the room intended

for panelling 48hrs before installation.

Ensure walls are clean, smooth and level with any

loose wall paper or paint removed.

We recommend panels are cut as required during the installation process

to ensure an accurate fit.

Panelling is supplied primed and can be finished in paint

following the manufacturers guidelines. Lightly sand as required.

Panelling is splash-proof but must not be submerged

or subjected to constant running water.

Remove the panel and apply adhesive to the back of the panel.

Peel backing from adhesive strip and fit the panel to the wall.

Note:

 Alternatively panels can be pinned in position. 

Position and join the panels together preparing

each panel as required. Press firmly to the wall.

Note:

 Ensure sections are fully located.

4

x1 Anchor - 500 x 45mm