Installation:
1. Place the upper seal (B) over the base of the tap body (A).
2. Place the tap (A) and upper seal (B) onto the sink and pass the ½” inlet through the taphole. With the tap (A) in place check that
the inlet meets the water feed. If further adjustment to the plumbing is required do this now. The hot tap should be connected to the
left hand side of the sink when viewed from the front.
3. Place the lower seal (C) over the base of the tap body (A) flush with the underside of the sink.
4. Fasten the fixing nut (D) securely onto inlet fixing the tap into its correct location, do not over tighten nut (D).
5. Connect the taps (A) to the water supply. We recommend the use of ½” BSP tap connectors and 15mm copper pipe, to help
stabilise the taps.
After installation:
Once you have visually checked the installation of the new
tap and all connections, ensure that all other fittings are
closed except the new tap which should be left open.
Turn on your water heating system and ensure that your
mains stopcock is open. Reconnect both the hot and cold
water supplies to this fitting.
Check the function of flow and function of hot and cold
water.
Turn off the tap and check carefully for any leaks around all
connections on the fitting and adjoining plumbing.
If possible return to the installation after a longer period to
double check for slower leaks. If pressure testing
equipment is available check the installation to the
maximum recommended pressure.
Clean the tap to remove any marks created during
installation as instructed then place a bag over the product
to protect the tap until it is ready for use.
The installation should be periodically checked for damage,
if the property is left unattended for a prolonged period we
recommend isolating water supplies.
Key:
Description:
Qty.
A
Tap body
2
B
Upper seal
2
C
Lower seal
2
D
Fixing nuts
2