3.3
Mounting the ash rotor BioLyt (50-75)
The ash rotor is fixed to the screw pipe of the ash screw.
Fig. 06
Rotor attachment points
(2x thread M8)
Screw the rotor in place with the screws M8x16 and circlips
(non-corroding) provided (Fig. 06).
NOTICE
• No longer screws are to be used.
• Alignment: The rotary axis of the rotor bla-
de must be located on the right adjacent to
the ash discharge screw (screws provided
with the rotor).
• The correct functioning of the rotor must be
checked when the boiler is commissioned
by Hoval Service.
3.4
Water-side and flue-gas side connecti-
on BioLyt (50-75)
•
The boiler can be connected up before fitting the casing
• A return temperature control system is required (see
hydraulic schematics for the individual system)
• A temperature-controlled safety drain valve must be in-
stalled (position of the immersion sleeve (1, Fig. 07 and
!
WARNING
• A combined draught-explosion damper
between boiler and flue is mandatory.
• it must be positioned in such a way that
no-one will be injured in the event of de-
flagration.
• the combination draught-explosion damper
must be positioned within the boiler room.
BioLyt (50)
1
Fig. 07
BioLyt (70,75)
1
Fig. 08
11
4 214 852 / 01
ASSEMBLy BIOLyT (50-75)
Summary of Contents for BioLyt 100
Page 7: ...7 4 214 852 01 NOTES...
Page 21: ...21 4 214 852 01 NOTES...
Page 51: ...51 4 214 852 01...