Installation manual
5
BelariaS04~08A3
Hoval BelariaSRM
4PW74445-1A – 2012.11
4 211 845 / 00 – 11/12
4 Starting up the outdoor unit
3.5.3 To fix the fluorinated greenhouse gases label
1
Fill in the label as follows:
2
Fix the label on the inside of the outdoor unit near the gas and
liquid stop valves.
3.6
Connecting the electrical wiring
3.6.1 About electrical compliance
Only for BelarBelariaS08A3
Equipment complying with EN/IEC 61000-3-12
(European/International Technical Standard setting the limits for
harmonic currents produced by equipment connected to public low-
voltage systems with input current >16 A and
≤
75 A per phase.).
3.6.2 To connect the electrical wiring on the
outdoor unit
1
Remove the 2 switch box cover screws.
2
Remove the switch box cover.
3
Open the wire clamp.
4
Connect the interconnection cable and power supply as follows:
5
Install the switch box cover.
3.7
Finishing the outdoor unit installation
3.7.1 To finish the outdoor unit installation
1
Insulate and fix the refrigerant piping and interconnection cable
as follows:
2
Install the service cover.
4
Starting up the outdoor unit
See the indoor unit installation manual for configuration and
commissioning of the system.
a
From the multilingual fluorinated greenhouse gases label
peal off the applicable language and stick it on top of
a
.
b
Factory refrigerant charge: see unit name plate
c
Additional refrigerant amount charged
d
Total refrigerant charge
DANGER: RISK OF ELECTROCUTION
WARNING
Always use multicore cable for power supply cables.
d
c
b
a
2x
1
1
2
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Liquid pipe
e
Liquid pipe insulation
f
Finishing tape
3x
1 2 3
f
b
a
e
d
c
4PW74445-1A - 2012.11_offset.book Page 5 Thursday, December 13, 2012 4:01 PM