Summary of Contents for TM-500AAE
Page 4: ...iii 8 FLUSH WATER VALVE 59 9 CONTROLLER BOARD 60 10 LINE VALVE 60...
Page 7: ...3 2 DIMENSIONS CONNECTIONS...
Page 13: ...9 2 WIRING DIAGRAM a WIRING DIAGRAM...
Page 14: ...10 b CONTROL BOX LAYOUT...
Page 24: ...20 d SEQUENCE 1 Startup Water Supply Floor Mounting...
Page 25: ...21 1 Startup Water Supply Fixed Mounting...
Page 28: ...24 3 Startup After Fan Motor and Line Valve start Compressor starts in 15 sec Floor Mounting...
Page 29: ...25 3 Startup After Fan Motor and Line Valve start Compressor starts in 15 sec Fixed Mounting...
Page 30: ...26 4 Startup Ice production starts Floor Mounting...
Page 31: ...27 4 Startup Ice production starts Fixed Mounting...
Page 32: ...28 5 Normal Operation Bin control and drain cycle 480 sec start Fixed Mounting...
Page 35: ...31 7 Shutdown Drain Floor Mounting...
Page 36: ...32 7 Shutdown Drain Fixed Mounting...
Page 57: ...53 Fig 1 Fig 2 Fig 3...