14
[c] SET UP
[c] SET UP
[c] SET UP
[c] SET UP
[c] SET UP
1) Secure the Legs to the condenser unit with eight M8 x 16 mm Hexagon Bolts and M8 Nuts
as shown in the illustration. See Fig. 5.
Note: Locate the Legs symmetrically.
2) The Legs have eight mounting holes. Secure the Legs with eight bolts (not included).
3) Install enough length of two copper tubings provided with Aeroquip couplings between the
icemaker and the condenser unit. The two copper tubings should be insulated separately.
See Fig. 7.
•
Precharged tubing kits, available as optional equipment from HOSHIZAKI AMERICA, are
recommended.
4) Line sets fabricated in the field should be evacuated through the charging ports on the
Aeroquip couplings and charged with R-404A refrigerant vapor to a pressure of 15 - 30
PSIG.
Note: Factory fabricated tubing kits are precharged and do not need to be evacuated.
5) Remove the plastic caps protecting the couplings. Attach the two refrigerant lines to the male
couplings on the icemaker and the remote condenser unit. Each refrigerant line must be
connected as follows:
Icemaker discharge refrigerant line - 3/8" (9.52 mm) OD tubing to “DIS” of condenser unit
Icemaker liquid refrigerant line - 1/4" (6.35 mm) OD tubing to “LIQ” of condenser unit
Note: Care should be taken that the unit, line set and Condenser contain the same type
refrigerant prior to making connections. Mixing of refrigerants will result in improper
operation and possible damage to the refrigeration system. Make the connections at
the remote condenser first and then at the icemaker.
Fig. 5
Fig. 5
Fig. 5
Fig. 5
Fig. 5
Fig. 6
Fig. 6
Fig. 6
Fig. 6
Fig. 6