![Hoshizaki DIM-30DE-2 Service Manual Download Page 44](http://html1.mh-extra.com/html/hoshizaki/dim-30de-2/dim-30de-2_service-manual_2165045044.webp)
40
Notes on timing charts (*1, *2, *3)
Item
DIM-30DE-2
*1 Water pan defrost control
Ambient temp in control
23°C or less
Hot gas valve on/off time
10/20s
*2 Defrosting water supply time (water temp less than 13°C, or initial
cycle)
15s
*2 Defrosting water supply time (water temp 13°C or more)
6s
*3 Icemaking water / additional water supply time
20s
1) When the power is turned on or the unit resumes operation after a bin control cycle,
the water temperature is considered less than 13°C and the water valve opens for 15
seconds to supply defrosting water. If the water temperature is normal, the water pan
opens and immediately starts to close again. In this case, defrosting water flows for 6
seconds.
2) The pump motor starts after the water pan closes and the icemaking water supply
completes.