16
b)
HGV Diagnosis
: If Comp is energized and evaporator is not warming, check that
HGV energizes and opens. If not, check for 115VAC at CB C1 (BR) to neutral (W)
and CB B1 (P) to neutral (W). If 115VAC is present at CB C1 (BR) to neutral (W) and
not at CB B1 (P) to neutral (W), replace CB. If 115VAC is not present at CB C1 (BR)
to neutral (W), check wiring connections from BC. If 115VAC is present, check HGV
coil continuity. Replace as needed.
c)
WV Diagnosis
: Confirm LED 3 is on. If not, replace CB. If LED 3 is on, check that
water enters the water tank. If not, check that the water supply line shut-off valve is
open and screens or external filters are clear. Check for 115VAC at CB C2 (BR) to
neutral (W) and CB A2 (O) to neutral (W). If 115VAC is not present at CB C2 (BR) to
neutral (W), check wiring from BC. If 115VAC is present at CB C2 (BR) to neutral (W)
and not at CB A2 (O) to neutral (W), replace CB. If 115VAC is present and WV does
not energize, check WV coil continuity. If open, replace WV.
d)
FM and PM Diagnosis
: If FM and PM continue after LED 2 turns off, replace CB.
e)
Normal Harvest Cycle Termination Diagnosis
: For a thermistor check, see
"II.D. Thermistor Check." If evaporator is warming, thermistor reading is correct, and
harvest does not terminate, replace CB.
6)
Normal Freeze Cycle – LED 1 is flashing and LED 2 is on
. Comp continues. FM and
PM energize. HGV and WV de-energize. CB monitors the cooling of the evaporator via
the thermistor located on the evaporator for freeze termination. When the thermistor
drops to 27°F (-3°C), CB reads 6.8 kΩ from the thermistor and starts 3-min. FT. 27°F
(-3°C) or lower must be maintained the entire 3 min. If reading rises above 27°F (-3°C)
before 3-min. FT terminates, 3-min. FT resets. When 27°F (-3°C) or lower is maintained
for 3 min., 5-min. FTT starts.
a)
Comp Diagnosis
: If Comp de-energizes, check PTC relay continuity. If open,
replace PTC. If closed, check Comp external protector and motor winding continuity.
Replace as needed. If Comp is energized but evaporator is not cooling, check for an
inefficient Comp. See "VIII.A. Specification and Performance Data."
b)
FM and PM Diagnosis
: If FM and PM do not energize, check for 115VAC at CB
B1 (P) to neutral (W) and CB A1 (DBU) to neutral (W). If 115VAC is present at CB
B1 (P) to neutral (W) and not at CB A1 (DBU) to neutral (W), replace CB. FM-If
115VAC is present at CB A1 (DBU) to neutral (W), check FM or PM motor winding
continuity, fan blade or PM impellar for binding and PM capacitor.
c)
HGV and WV Diagnosis
: Confirm HGV and WV de-energize. If HGV is energized,
check for 115VAC at CB B1 (P) to neutral (W). If 115VAC is present after PM
energizes, replace CB. If 115VAC is not present and HGV is bypassing, replace HGV.
If LED 3 is on after LED 2 turns on, replace CB. When LED 3 turns off, make sure
WV is not leaking by. If WV is leaking by, replace WV.
d)
Normal Freeze Cycle Termination Diagnosis
: 5-min. FTT terminates, harvest cycle
starts. If not, check evaporator temperature where thermistor is mounted and check
the thermistor. See "II.E. Thermistor Check." If evaporator temperature is below
27°F (-3°C) for more than 8 min. and freeze does not terminate, replace CB.