1
Spraying mixture container
2
Fresh water tank
3
Agitator
4
Internal cleaning
5
Illuviation valve
6
Injector
7
Eco Fill
8
External filling front right (optional)
9
PowerFill active filling pump (optional)
10
Direct filling/residue drain
11
Switch-over ball valve, solution
12
Switch-over ball valve, fresh water/solution
13
Fresh water filling
14
Filling level sensor, fresh water tank
15
Switch-over ball valve, fresh water/suction aid
(only with CCS)
16
Piston diaphragm pump (only with CCS)
17
Suction filter piston diaphragm pump (only with CCS)
18
NightLight with cleaning (optional)
19
Electrical pump NightLight cleaning (optional)
20
High pressure cleaner (optional)
21
Filter NightLight/outside cleaning (optional)
22
Suction filter with drain valve
23
Centrifugal pump
24
Spraying pump pressure sensor
25
External pressure output
26
Mechanical 6-way valve on pressure side
27
Air valve (optional)
28
Switch-over ball valve illuviation valve/fresh water
tank filling (optional)
29
Agitator intensity
30
Switch-over ball valve outside/internal cleaning (optional)
31
Outside cleaning (optional)
32
Internal cleaning pressure sensor
33
Agitator pressure sensor
34
3-way valve pressure filter
35
Pressure filter drain
36
3-way valve pressure filter
37
Pressure filter drain
38
Pressure filter flushing, mechanical (adjustable
intensity)
39
Pressure filter
40
Pressure filter
41
Folding boom supply lock valve (2x)
42
Flow meter
43
Switch-over ball valve circulation/spraying
44
Pressure sensor folding boom
45
Folding boom
222
223
Summary of Contents for Leeb 5.280 VL
Page 2: ......
Page 5: ......
Page 11: ...7...
Page 219: ...Diagram a with example 215...
Page 225: ...221...
Page 228: ...5 1 2 8 9 10 13 12 23 26 28 224...
Page 230: ...26 39 40 42 43 45 226...
Page 234: ...44 1 2 5 8 9 10 16 25 12 14 230...
Page 236: ...44 50 45 44 47 48 232...
Page 279: ...Central frame middle frame tractor link arm Parallelogram lock 275...
Page 307: ......