background image

LMAN0071-01-EN

Hazardous Location Series

07/29/20

 

 

Page 2 

 

 
 

GENERAL WIRING DIAGRAM

• 

CAUTION:

 Turn off electrical power at fuse

   or circuit breaker box before wiring fixture 

   to the power supply.

   Connec�ng panels to AC source supply:

   All units must be individually connected

   to the AC supply.

 

Black = Line

 

White = Neutral

 

Green = Ground

INSTALLATION & OPERATION

Electrical Connec�on:

1. Loosen the ten M6 hexagon bolts with spring washers and nuts of Tank Cover with torque value 7 N-m.

2. The thread of entry hole of Tank is 3/4” NPT. A�ach the Tank to suitable conduit.

3. Inset the wire from outside through the conduit and the entry hole of Tank, then connect to Terminal Block.

4. Introduce the wires of branch circuit as following:

 

Black wiring connects to Line

 

White wiring connects to Neutral

 

Green wiring connects to Ground

5. Re-a�ach the Tank Cover and �ghten it by ten M6 hexagon bolts 

     with spring washers and nuts with torque value 7 N-m.

6. Check the �ghtness of conduit and Tank Cover.

Wall/Ceiling/Floor Moun�ng Bracket:

7. The moun�ng bracket is for the use 

     of wall/ceiling/floor moun�ng.

8. Posi�on the moun�ng bracket and 

     fix it by means of two M6 and two

     M8 hexagon bolts with spring lock

     washers.

9. Secure the wall/ceiling/floor moun�ng

     bracket to the structure by using

     screws. (not provided). 

FIGURE 1

10. The luminaire can be adjusted facing

     down 90º from ver�cal = Lens

     horizontal facing down on ceiling 

     posi�on. 

FIGURE 2

11. The luminaire can be adjusted up and

     down by 45º on wall/floor posi�on only. 

FIGURE 3

Figure 1

Figure 2

Figure 3

Wall Type

Floor Type

Ceiling Type

LED Driver

BLACK (LINE)
GREEN (GROUND)
WHITE (NEUTRAL)

AC INPUT

( - )          ( + )

LEAN WIRES

TO LED LOAD

Terminal

Block

Reviews: