
10
11
BOLT(A)
Qty: 2
NUT(B)
Qty: 2
BUSHING(C)
Qty: 2
ASSEMBLY
STEP 6
ASSEMBLY
STEP 5
A Open
HARDWARE BAg FOR STEP 5.
B Attach the
RESISTANCE CYlINDER
to the
lEFT
HANDlEBAR
using 1
BOlT (A)
, 1
BUSHINg (C)
and
1
NUT (B)
.
C Repeat on the other side.
NOTE: There is no hardwarebag for this step.
A Attach
CONSOlE
to the
CONSOlE MAST
using pre-
attached screws.
B Attach the
WATER BOTTlE HOlDER
to the
CONSOlE
MAST
using pre-attached screws.
C Press the
ROUND CAP
into the top opening of
CONSOlE MAST
.
HARDWARE BAg FOR STEP 5 CONTENTS :
BOLT (A)
RESISITANCE CYLINDER
NUT(B)
BUSHING (C)
CONSOLE
WATER BOTTLE HOLDER
PRE-ATTACHED SCREWS
ASSEMBLY COMPLETE!