background image

5 - INSTALL BLIND INTO PELMET

With the gate brackets in the opening 

position and by holding the right side

 

of the blind by the head rail only, lift

 

the head rail into position and secure 
gate brackets.

6 - CLOSE GATE BRACKETS

Close all gate brackets and tighten screws.

9 - CUT CABLE TIES

 

A Tighten swage until the cable guide is rigid 

and lock off wall NUT. Trim any

 

excess cable guide under swage.
B

 

Cut cable ties off spring tension brackets

in head rail, AFTER having terminated the 
cables to release tension.

10 mm

10 mm

10 mm

10 mm

E

C

B

Disclaimer: These leaflet instructions are a guide for professional installers only. 

Motors: Refer to manufacturers instructions supplied with blind. Always set blind limits using the test lead.

B

A

Face fix

Timber

Alternate timber or concrete

Concrete

D

Cut 

cable 

guide 

to 

length 

10 mm

7 - TERMINATE

A Depending on type of termination install 
EITHER bracket, insert rampa screw, top

hat OR concrete insert. (Cable guide MUST
be plumb, locate termination via laser.) 

B Insert swage with 10 mm of thread

 

showing as illustrated.

C Cut to length to underside of swage plus 10 
mm and insert cable into swage.

D Use pliers if required on bottom 
stripped section of cable guide to ensure 
cable is in a straight position for tightening.

E Tighten the 3 grub screws while

GENTLY pulling the cable down.

 

(DO NOT use pliers on cable).  

Use a 2.5 mm high quality hexagon key 
wrench* to firmly tighten screws until recessed 

to a minimum of 1 mm. 

*(Allen key) for example Gedore, Belzer or Stahlwille.

INSTALLATION GUIDE - SPECIALTY VENETIAN BLINDS

+61 2 8755 4500

[email protected]

horiso.com.au

Reviews: